My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2002 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:14:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2003
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/18/2002 09:46 120936F1543 TANKNOLOGY PAGE 03/11 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> . 1 r Tanlvwology <br /> FTEST 09/16/02 6900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMSER2223782 <br /> CLIENT:SAFEWAY INC. AUSTIN,TEXAS 78757(512)451-6334 SITE:SAFEWAY 2600 <br /> Tank ID: 87 1 Tank manifolded: NO Bottom to top fill in inches: 185.0 <br /> Product: RSG UNLF.A.D Vent manifolded: YES Bottom to grade in inches: 3-91.0 <br /> Capacity in gallons: 20,073 Vapor recovery manifolded: YES Fill pipe length in inches: 65.0 <br /> Diameter in inches: 120.00 Overfill protection: YES Fill pipe diameter in inches: 4.o <br /> Length in inches: 414 Overspill protection: YES Stage I vapor recovery: <br /> Material: DW STEEL Installed: ATG Stage II vapor recovery: ASSIST <br /> CP installed on: <br /> COMMENTS <br /> �rAN> ,Y>rsr� i= t3jr. c`t <br /> Start(In) End(in) <br /> New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Water Level: 0.00 0.00 <br /> L.D.#t L.D.41 L.D.#2 l D.#2 <br /> Dipped Product Level: 61.00 61.00 <br /> Probc Water Level: o.o47 0.047 Make: vsBAERROOT VEEDER1MOOT <br /> Ingress Detected: Water N Bubble N UllageN Model: ELECTRONIC ELECTRONIC <br /> Test time. 13-02-14t43 S/N: <br /> Inclinometer reading: 0.00 Open time in sec: <br /> Holding psi: 23- 18 <br /> VacuTect Test Type: single tank Resiliency in ml: <br /> VacuTect Probe Entry Point: Gage Test leak rate ml/m: 189.0 189.0 <br /> Pressure Set Point: -0.50 Metering psi: <br /> Tank water level in inches: 0.00 Calib, leak in gph: 1.00 3.00 <br /> Water table depth in inches: 191.00 Results: PASS FAIL <br /> Determined by(method): SURVEY <br /> Result: PASS <br /> COMMENTS <br /> COMMENTS Turbin zoom at 21 psi. Nover get a good P1 pressure for test. <br /> Double walled dry annular <br /> Meg probe used. T2001 test. <br /> t9 'i°�J .xx,�pr �y:},•y�' y ��� : �{�(1t` 'Sell I :j���9r1�. <br /> 8 L h t <br /> R"'. <br /> "r• � ;�9� ..� �. ,' .�" �� qt_w � �14'�ii�l�.� <br /> INFO=. <br /> Material: APT FLEXIn APT FLEXIn <br /> Diameter(in): 1.5 1.5 <br /> Length(ft): 125.0 1.25.0 <br /> Test psi: 50 so <br /> Bleedback cc: 225 195 <br /> Test time (min): 60 60 <br /> NOT NOT <br /> Start time: 14:30 14-.30 TESTED TESTED <br /> End time: 15:30 15:30 <br /> Final gph: 0.000 0.000 <br /> Result: PASS PASS <br /> Pump type: PRESSURE PRESSURE <br /> Pump make: FE P£TRO FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Draft 09/18/2002 09:01 MSHAW <br />
The URL can be used to link to this page
Your browser does not support the video tag.