Laserfiche WebLink
iitoring System Certification <br /> Site Address: 1987 WEST 11 TH Date of Testing/Service: 09/16/2002 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 123 <br /> Complete the following checklist: <br /> E Yes No' Is the audible alarm operational? <br /> ❑x Yes ❑No Is the visual alarm operational? <br /> ❑x Yes No Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not Yes No" interfere with their proper operation? <br /> © Yes ❑No' N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> © Yes ❑No' ❑NA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑x Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑x Yes ❑No <br /> © Yes ❑No' ❑N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? ao % <br /> ❑ Yes' ©No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes' ❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. If yes,describe causes in Section E,below. <br /> © Yes ❑No` Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> © Yes ❑No' Is all monitoring equipment operational per manufacturers'specifications? <br /> 'In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> North PLLD on Reg is not testable at this time. <br /> Sensors in the Dispenser pans are not place correctly, Brackets not installed yet. I am certifying the sensors trip and shut down <br /> turbine as programed with the exception of the North PLLD on reg at this time. <br /> page 2 of 3 <br />