Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Myo <br />I. CONTINUOUS ELECTRONIC MONITORING OF DER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: `/G (�. ! TC -s- �'CJI�' — Mst' MODEL #: RIi %��) ` /[) 7 Msz, <br />LEAK SENSOR MANUFACTURER: "c. ' M59. MODEL #(S): %gt-/ _?, k'6?- Z C5a Msa. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? Ov a. YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES R b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ,k a. YES ❑ b. NO Msz <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: Msa MODEL #(S): M59. <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) Mro' <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) MGI. <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mso. <br />1. ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />S. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): Mal. <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By <br />January 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training will include, but is not limited to, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices. <br />The facility employee's role with regard to the leak detection equipment. <br />D The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMARNTS/ADDITIONAL INFORMATION <br />Please use this section to include any, additional UST system monitoring-related information (e.g., additional information required by your local agency): Mss. <br />9x11--riw%F sed- ezt - Co I Sh"'7- �-cr 4t <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />OWNER(OPERATOR SIGNATURE REPRESENTING <br />DATE: M91. <br />Owner M92. <br />[:1GCJ <br />Operator <br />/) , 60— <br />fT(J7- <br />�- <br />OWN R/OPERATOR NA (print): M92. <br />OWNER/OPERATOR TITLE: M97. <br />S1/11L <br />(Agency Use Only) This plan has been reviewed and: ❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: Date: <br />Comments/Special Conditions: <br />SJCEHD-d (07/03) - 3/4 07/23/03 <br />