Laserfiche WebLink
DEC-05-2011 10:25 SERVICE STATION 14789388888 P.05 <br /> Y' rs <br /> `r 1 <br /> Y:, : <br /> S. SECONDARY PJPE TESTING 1, <br /> Test Method Developed By: p Piping Manufacturer ® Industry Standard ❑ Professional Engineer = <br /> ❑ Other(Specie) <br /> Test Method Used: ®Pressure ❑ 'Vacuum Cl Hydrostatic <br /> ❑ Other(Spectfy) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution; 0.5% of span s" <br /> Piping Run#81 Piping Run 0 41 Piping Run#Diesel <br /> Piping Material: Plastic Plastic Plastic <br /> Piping Manufacturer: Western fiberglass Western fiberglass Western fiberglass Y <br /> Piping Diameter: 2" 2" 2" r <br /> Length of Piping Run: 100' 100' 100' <br /> Product Stored: Gasoline Gasoline Diesel <br /> Method and location of <br /> .Reducer Boots/Fittings Redacer Boots/Fittings Reducer Boots/Fittings <br /> piping-run isolation: �,. .� <br /> Wait time between applying <br /> pressure/vacuum./water and 10 minutes 10 minutes 10 minutes <br /> starting test: .w <br /> '.s <br /> Test Start Time: 10:15 am 10:15 am 10:15 am :t <br /> Initial Reading(RI): 5 psi 5 psi 5 psi <br /> Test End Time: 11:15 am 1 1:15 am 11:15 am P, X <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr. 1 hr. I hr. <br /> Change in Reading(Rr-Rt): none none none <br /> Pass/F'ai1 Threshold or No detectable Loss No detectable Loss No detectable]Loss <br /> Criteria: <br /> Test Result: (M Pass ❑Fail ® Pass 0 FAiI IM Pass ❑Fail <br /> Comments—(include inforrnation on repairs made prior to testing, and recommended follow-up for failed tests) <br /> f <br /> kjb 4 <br /> 0 <br /> \.Y <br /> _ In <br /> e:F. <br /> • y <br /> .'rL <br /> < 1 <br /> I <br /> b. <br /> y r. <br /> ..7 <br />