Laserfiche WebLink
Monitoring System Certification-Page 2 of 3 <br /> Site Address: 1804 West 11Th. Street Date of Testing/Servicing: 6/2/11 <br /> D. Results of Testing/Servicing <br /> Software Version Installed• 329.02 <br /> Complete the following checklist: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ® Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem) <br /> ❑ N/A operational? <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ® Sump/Trench Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ® Yes ❑ No <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ❑ N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90 % <br /> ® Yes* ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product;❑ Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set-up reports,if applicable.) <br /> ® Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Replaced 87 Annular 420 to 460 due to cord length,Tested and Passed <br /> 91 &Diesel are split tanks and share annular <br /> Two Turbines in 87 Tank and PLLD's-North(Q1)&South(Q2),Tested and Passed <br />