Laserfiche WebLink
Stantec <br /> Further Assessment Work Plan <br /> Stockton Charter Way Commingled Plume <br /> February 15, 2011 <br /> 2.0 Proposed Scope of Work <br /> 2.1 Well Decommissioning <br /> The current property owner plans to remodel the existing ARCO-branded gasoline service <br /> station [former Texaco (Shell)] according to the remodeling plan included as Appendix B. The <br /> remodeling plan is currently being reviewed by the City of Stockton and may be subject to <br /> change. According to the remodeling plan, a retail building will be constructed at the northwest <br /> corner of the Shell property in the vicinity of existing groundwater monitoring wells SMW-7, <br /> SMW-18-80, and SMW-18-120. To accommodate the remodeling, a total of three wells (SMW-7, <br /> SMW-18-80, and SMW-18-120) will be decommissioned according to the San Joaquin County <br /> Environmental Health Department (SJCEHD) Well Standards (SJCEHD, 2005) as described in <br /> Section 3.0 of this Work Plan. <br /> In addition to the wells listed above, Stantec proposes to decommission the following wells: <br /> AMW-10, AMW-12, CMW-1 through CMW-3, SLMW-1, SLMW-7S, SLMW-7D, SMW-1, SMW-4, <br /> SMW-5, SMW-6, SMW-9, SMW-10, SMW-11, SMW-13, and SMW-17 (17 wells). Based on the <br /> boring logs and the generalized cross-sections included in the SCM, these wells (except AMW- <br /> 10, AMW-12, and SLMW-7D) are screened across multiple water-bearing zones and some are <br /> located near contaminant sources. Well SLMW-7D is constructed in the same borehole as <br /> SLMW-7S. Based on the A zone groundwater isoconcentration map, the groundwater impacts <br /> are delineated towards the north side at the former ARCO Service Station No. 2168 with wells <br /> AMW-8, AMW-9, and AMW-11, and nearby wells AMW-10 and AMW-12 are no longer <br /> necessary. The following table lists the wells to be decommissioned and the rationale for each. <br /> The boring logs are included in Appendix C. <br /> Table 2.1: List of wells to be decommissioned <br /> Screen <br /> Well ID Zone Top Bottom Justification <br /> (ft bgs) (ft bgs) <br /> AMW-10 A 17 32 No longer necessary <br /> AMW-12 A 17 32 No longer necessary <br /> CMW-1 A & B 30 50 Cross-screened <br /> CMW-2 A 30 50 Screened in mostly clay between A and B <br /> CMW-3 A & B 30 50 Cross-screened <br /> SLMW-1 A & B 26 46 Cross-screened <br /> SLMW-7S B & C 55 63 Cross-screened, installed in tank pit <br /> Screen not at top of C zone, nested with <br /> SLMW-7D C 80 85 SLMW-7S, screen spans clay, installed in <br /> tank pit <br /> SMW-1 A & B 26 46 Cross-screened <br /> SMW-4 A & B 25 45 Cross-screened <br /> Stockton Charter Way Commingled Plume Further Assessment Work Plan.doc 3 <br />