Laserfiche WebLink
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Screened Filter Pack Bentonite Seal Cement Seal Water- <br /> Location I.D. Installation Elevation Total Depth Diameter Diameter Casing Slot Size Interval Interval Interval Interval Bearing Comments <br /> Date feet (feet bgs) inches inches Material (inches) feet b s feet b s feet b s feet b s Zone <br /> Monitoring Wells(MW) <br /> CMW-1 03/15/95 12.053 51.5 8 2 Sch.40 PVC 0.020 30-50 28-51.5 26-28 0-26 A&B <br /> CMW-2 03/15/95 11.517 51.5 8 2 Sch.40 PVC 0.020 30-50 28-51.5 26-28 0-26 A&B <br /> CMW-3 03/16/95 10.843 51.5 8 2 Sch.40 PVC 0.020 30-50 28-51.5 26-28 0-26 A&B <br /> CMW-4A 01/22/08 10.879 32 8 2 Sch.40 PVC 0.010 17-27 15-27 13-15 0-13 A <br /> CMW-4C 1/15-25/08 10.890 60 14/8 2 Sch.40 PVC 0.010 50-60 47.9-60 45.9-47.9 0-43.5,0-45.9 B <br /> CMW-5A 01/21/08 10.948 30 8 2 Sch.40 PVC 0.010 17.5-27.5 15.5-27.5 13.5-15.5 0-13.5 A <br /> CMW-5C 1/14-24/08 11.001 60 14/8 2 Sch.40 PVC 0.010 50-60 44-60 42-44 0-47,0-42 B <br /> CMW-6A 01/22/08 12.054 28 8 2 Sch.40 PVC 0.010 17-27 15-27 13-15 0-13 A <br /> CMW-6C 1/16-25/08 12.073 60 14/8 2 Sch.40 PVC 0.010 50-60 47.9-60 45.9-47.9 0-43.5,0-45.9 B <br /> CMW-7A 01/23/08 12.000 30 8 2 Sch.40 PVC 0.010 17-27 15-27 13-15 0-13 A <br /> CMW-7B 1/18-23/08 12.001 38 14/8 2 Sch.40 PVC 0.010 33-38 31-38 29-31 0-29,0-29 A <br /> CMW-7C 1/17-24/08 12.079 60 1 14/8 1 2 1 Sch.40 PVC 1 0.010 1 50-60 1 47.9-60 1 45.9-47.9 0-43.5,0-45.9 B <br /> Cone Penetrometer Test(CPT) <br /> CPT-1 07/23/05 - 73 - - - - - - - <br /> CPT-2 07/20/05 87 <br /> CPT-3 07/20/05 92 <br /> CPT-4 07/19/05 88 <br /> CPT-5 07/18/05 60 <br /> CPT-6 07/23/05 59 <br /> CPT-7 07/23/05 57 <br /> CPT-8 07/21/05 100 <br /> CPT-9 07/21/05 58 <br /> CPT-10 1 07/23/05 67 <br /> Former Colombo/Toscana Bakery(Sara Lee) <br /> Soil Borings(SB and C) <br /> SB-1 02/07/96 41.5 0-41.5 <br /> SB-2 02/07/96 41.5 - 0-41.5 <br /> C1 05/01/07 44 2.25 0-44 <br /> C2 05/02/07 44 2.25 0-44 <br /> C3 05/02/07 46 2.25 0-46 <br /> C4 05/03/07 46 2.25 0-46 <br /> C5 05/03/07 44 2.25 0-44 <br /> C6 05/03/07 46 2.25 0-46 <br /> C7 05/03/07 48 2.25 0-48 <br /> C8 05/02/07 44.5 2.25 0-44.5 <br /> C9 05/01/07 44 2.25 0-44 <br /> C10 05/01/07 44 2.25 0-44 <br /> C11 04/30/07 46 2.25 0-46 <br /> CT-8-130 06/24/09 130 8 0-130 <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 4 of 7 Stantec <br />