Laserfiche WebLink
TABLE 1 <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440, 441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br /> TOC Borehole Casing Screened Filter Pack Bentonite Seal Cement Seal Water- <br /> Location I.D. Installation Elevation Total Depth Diameter Diameter Casing Slot Size Interval Interval Interval Interval Bearing Comments <br /> Date feet (feet bgs) inches inches Material (inches) feet b s feet b s feet b s feet b s Zone <br /> Angle Boring(AB) <br /> AB-3 05/09/89 34.6 8.5 0-34.6 Horizontel offset=20 feet <br /> Vertical offset=34.6 feet <br /> Monitoring Wells(MW) <br /> SMW-1 05/11/89 11.700 46 10.5 4 SCH.40 PVC 0.020 26-46 23-46 22-23 0-22 A&B <br /> SMW-2 05/12/89 12.594 46 10.5 4 SCH.40 PVC 0.020 26-46 23-46 22-23 0-22 A <br /> SMW-3 05/11/89 12.573 51 10.5 4 SCH.40 PVC 0.020 31-51 28-51 27-28 0-27 B <br /> SMW-3-79 10/18/05 12.917 80 6 2 SCH.40 PVC 0.010 69-79 68-79 65-68 0-65 C <br /> SMW-3-119 10/14/05 12.968 120 9 4 SCH.40 PVC 0.010 109-119 108-119 105-108 0-105 D <br /> SMW-4 05/24/89 11.147 46.5 10.5 4 SCH.40 PVC 0.020 25-45 23-45 22-23 0-22 A&B <br /> SMW-5 05/23/89 11.752 45 10.5 4 SCH.40 PVC 0.020 20-45 18-45 17-18 0-17 A&B <br /> SMW-6 02/08/90 11.484 50 10.5 4 SCH.40 PVC 0.020 25-50 23-50 22-23 0-22 A&B <br /> SMW-7 02/09/90 11.460 45 10.5 4 SCH.40 PVC 0.020 22-42 21-45 20-21 0-20 A&B <br /> SMW-8 02/08/90 10.917 50 10.5 4 SCH.40 PVC 0.020 30-50 28-50 27-28 0-27 B <br /> SMW-9 05/01/90 11.361 49.5 10.5 4 SCH.40 PVC 0.020 29.5-49.5 28-49.5 27-28 0-27 A&B <br /> SMW-10 04/30/90 12.161 49.5 10.5 4 SCH.40 PVC 0.020 29.5-49.5 28-49.5 27-28 0-27 A&B <br /> SMW-10-81 10/18/05 12.191 81 6 2 SCH.40 PVC 0.010 71-81 70-81 67-70 0-67 C <br /> SMW-10-117 10/12/05 12.262 120 9 4 SCH.40 PVC 0.010 112-117 111-117 108-111 0-108 D <br /> SMW-11 04/30/90 11.393 49.5 10.5 4 SCH.40 PVC 0.020 29.5-49.5 28-49.5 27-28 0-27 A&B <br /> SMW-11-82 08/28/02 11.615 122 8 1.7 CMT - 72-82 67-84 64-67 0-64 C Nested well <br /> SMW-11-122 08/28/02 11.615 122 8 1.7 CMT - 112-122 109-122 84-109 0-64 D Nested well <br /> SMW-13 09/02/93 10.485 51.5 8 4 SCH.40 PVC 0.020 28.5-48.5 26.5-51.5 24.5-26.5 0-24.5 A&B <br /> SMW-14 09/03/93 11.024 51.5 8 4 SCH.40 PVC 0.020 29.5-49.5 27.5-51.5 25.5-27.5 0-25.5 B <br /> SMW-15 09/01/93 11.134 51.5 8 4 SCH.40 PVC 0.020 29.5-49.5 27-51.5 25-27 0-27 B <br /> SMW-16 09/03/93 -- 51.5 8 4 SCH.40 PVC 0.020 29.5-49.5 27.5-51.5 25-27.5 0-25 B Well destroyed 11/15/01 <br /> SMW-17 09/03/93 12.065 51.5 8 4 SCH.40 PVC 0.020 29.5-49.5 27.5-51.5 25.5-27.5 0-25.5 A&B <br /> SMW-18-80 08/23/02 12.086 120 6 1.7 CMT - 70-80 67-84 61-67 0-61 C CMT Well Casing <br /> SMW-18-120 08/23/02 12.086 120 6 1.7 CMT - 110-120 106-120 84-106 0-61 D CMT Well Casing <br /> SMW-19-81 08/27/02 11.898 83 8 4 SCH.40 PVC 0.020 71-81 68-83 64-68 0-64 C <br /> SMW-19-120 08/21/02 12.294 120 8 4 SCH.40 PVC 0.020 110-120 107-120 104-107 0-104 D <br /> SMW-20-83.5 10/24/07 12.089 85 6 2 SCH.40 PVC 0.010 73.5-83.5 71-85 67-71 0-67 C <br /> SMW-21-80 10/25/07 11.499 83 6 2 SCH.40 PVC 0.010 70-80 68-81 65.5-68,81-83 0-65.5 C <br /> SMW-22-80 10/26/07 11.901 81 8 2 SCH.40 PVC 0.010 70-80 68-81 65-68 0-65 C <br /> SMW-23 1 10/24/07 1 12.233 1 50 1 6 1 2 1 SCH.40 PVC 1 0.010 1 15-30 1 13-30,33-50 1 10-13,30-33 10-10 1 A <br /> Vapor Extraction Wells(VEW) <br /> SVEW-1S 04/28/92 11.398 41.5 12 4 SCH.40 PVC 0.020 13.5-23.5 12.5-24 11-12.5 0-11 A Nested well <br /> SVEW-1 D 04/28/92 11.404 41.5 12 4 SCH.40 PVC 0.020 30.5-40.5 28-41.5 24-28 0-11 B Nested well <br /> SVEW-2S 04/27/92 11.686 41.5 12 4 SCH.40 PVC 0.020 15-25 14-26.5 12.5-14 0-12.5 A Nested well <br /> SVEW-2D 04/27/92 11.698 41.5 12 4 SCH.40 PVC 0.020 30.5-40.5 29.5-41.5 26.5-29.5 0-12.5 B Nested well <br /> SVEW-3S 04/28/92 11.678 41.5 12 4 SCH.40 PVC 0.020 15-25 14-25 12.5-14 0-12.5 A Nested well <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 6 of 7 Stantec <br />