Laserfiche WebLink
Stantec <br /> Site History and Previous Investigations <br /> Stockton Charter Way Commingled Plume <br /> February 15, 2011 <br /> respectively. Following UST removal, the facility was demolished. These activities are <br /> summarized in the EMCON Results of Underground Storage Tank Removal and <br /> Overexcavation Activities dated August 5, 1996. <br /> In April and May 1996, EMCON observed ACES as they aerated approximately 300 cubic yards <br /> of hydrocarbon-impacted soil. These activities are summarized in the EMCON Completion <br /> of Soil Aeration Program dated May 20, 1996. <br /> The current property owner; Mr. Bill Halverson, constructed a car wash on the property in 2005. <br /> ARCO was asked by the owner to destroy MW-4 to make way for the new car wash. ARCO <br /> coordinated the well destruction activities to occur during property development. ARCO took <br /> advantage of these activities to coordinate the installation of a remediation system. <br /> SVE was conducted between January 1997 and February 1998 to remediate the vadose zone. <br /> SVE was terminated after an estimated mass of approximately 10,000 pounds (Ibs) <br /> (approximately 1,600 gallons) of TPHg were removed and influent benzene concentrations were <br /> less than the laboratory method reporting limits (MRL) of 0.5 milligrams per cubic meter. These <br /> activities are summarized in the Pinnacle Environmental Solutions of Cameron Park, California <br /> Results of Soil Vapor Extraction Assessment dated April 8, 1998. <br /> An AS/SVE system was installed in 2006 and was operated between the fourth quarter 2008 <br /> and fourth quarter 2010. The SVE system consisted of 22 vapor extraction wells (EW-1 through <br /> EW-17, VW-1, VW-7, VW-8, VW-10, and VW-11), a 15-horsepower vacuum blower, and a 200 <br /> cubic ft per minute (cfm) H2 Oil Recovery electric oxidizer (Model H2 CO). The AS system <br /> consisted of 22 sparge wells (SP-1 through SP-22) and a 20-hp Rietschle Thomas compressor <br /> (Model DLR 300). The AS/SVE system operated for 18,896 hours, removing approximately <br /> 4,074 lbs of GRO and 8.91 lbs of benzene. <br /> Chevron Facility#9-2033 <br /> Chevron operated the station until 1995, when the property was sold to a private dealer and <br /> has continued to operate as a Chevron-branded station. <br /> In March 1995, Groundwater Technology, Inc. of West Sacramento, California (GTI) installed <br /> three groundwater monitoring wells (MW-1 through MW-3) and one soil boring (SB-1) on the <br /> property. TPHg and benzene were detected in soil samples collected during the installation <br /> activities at concentrations up to 250 and 1.0 mg/kg, respectively. <br /> In August 2000, SECOR International Incorporated (SECOR) contracted Precision Sampling of <br /> Richmond, California (Precision) to advance three soil borings (SB-2 through SB-4). Cone <br /> penetrometer testing (CPT) technology was used to advance SB-3 and SB-4. No soil samples <br /> were collected from SB-3/CPT-01 or SB-4/CPT-02. TPHg was detected in soil samples <br /> collected from SB-2 at concentrations up to 130 mg/kg. TPHg, benzene, and MTBE were <br /> detected in groundwater samples collected from these borings at concentrations up to 42,000, <br /> 10,000, and 46,000 pg/L, respectively. These activities are summarized in the SECOR Site <br /> Assessment Report dated January 18, 2001. <br /> Appendix A- Site History and Previous Investigations.doc 3 <br />