Laserfiche WebLink
URS 0 <br /> Ms. Lori Duncan,REHS Page 2 <br /> San Joaquin Environmental Health Department <br /> October 5,2005 <br /> Following completion of remediation activities and approval from the SJEHD, the wells will be <br /> destroyed by exposing the well heads at the surface and over-drilling to total depth or pressure grouting <br /> with a mushroom cap, whichever method is appropriate for the site conditions. <br /> SVE/AS Well Network Layout <br /> The remediation well network configuration was modified at the request of ARCO to focus the interim <br /> remediation efforts on the known areas of impact. ARCO understands that based upon additional <br /> assessment in the eastern portion of the site, additional remediation may be required. <br /> If you have any questions or concerns,please call me at(916)679-2299. <br /> Sincerely, <br /> URS Corporation Americas ED GE0�0 <br /> PAUL <br /> Vernon Elarth,RG No. 7 20 <br /> Project Manager <br /> Exp. <br /> Attachments: SJCEHD Correspondence ST9�OF CPL�F��� <br /> Figure 1 —Site Plan <br /> cc: Mr. Nuel Henderson, SCDER <br /> Mr. Kyle Christie, Atlantic Richfield Company <br /> Mr. James Barton, CVRWQCB <br /> Mr. Bill Halverson,Property Owner <br /> Mr. Monty Zorb, RZ Carwashes,LLC.7808 Kelley Drive, Suite F, Stockton, CA 95207 <br /> Project File <br /> KAWpmcessV5 BP ARCM02168\2005 System Installation\SVE-AS SyslnsWP Addendum Edoe <br />