My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001280
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:40:05 PM
Creation date
3/1/2019 4:19:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001280
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r� <br /> Date _ February 22, 2001 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02168 Address 441 Charter Way, Stockton, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-329-1 <br /> Primary Agency/Regulatory ID No Lon Duncan, San Joaquin Coun Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 2000) <br /> 1 Performed quarterly groundwater monitoring and sampling for fourth quarter 2000 Groundwater <br /> samples were collected from monitoring wells MW-1 through MW-8, MW-18, MW-1C, MW-813 and <br /> MW-8C and submitted for chemical analysis <br /> 2 Delta compiled and evaluated groundwater monitoring data <br /> 3 Delta submitted a report documenting the findings of a soil and groundwater investigation conducted <br /> at the site during the third quarter 2000 <br /> • WORK PROPOSED FOR NEXT QUARTER(First 2001): <br /> The next sampling event is tentatively scheduled for February 2001 Groundwater samples will be <br /> collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG) using U S Environmental <br /> Protection Agency (USEPA) Method 8015, for benzene, toluene, ethylbenzene, and total xylenes(BTEX) <br /> using USEPA Method 8020, for oxygenates tertiary butyl alcohol (TBA), methyl tertiary butyl ether <br /> (MTBE), di-isopropyl ether (DIPS), ethyl tertiary butyl ether (ETBE), and tertiary amyl methyl ether <br /> (TAME), and 1,2-Dichloroethane(1,2-DCA) using USEPA Method 8260 <br /> Current Phase of Project Monitorin <br /> Frequency of Groundwater Sampling MW-1 through MW-8, MW-1 B, MW-1C, <br /> MW-813 and MW-8C= Quarter! <br /> Frequency of Groundwater Monitoring Quarterl <br /> Sample Date November 21, 2000 <br /> Is Free Product(FP) Present on Site No <br /> FP Recovered This Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 19 19 to 23 69 feet b s <br /> Direction of Groundwater Flow East-Northeast <br /> . Groundwater Gradient 0 008 ft/ft <br /> C\MyDocumentslARC0121681QTRLY1200012168Q400 Delta <br /> 2/22101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.