My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001304
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:36:05 PM
Creation date
3/1/2019 4:30:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001304
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. Date October 25 1996 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 0216 Address 441 Charter Way, Stockton, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-146 007 <br /> Primary Agency/Regulatory ID No _Ron Rowe, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Third 1996)- <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON installed four additional vapor extraction wells (see attached additional site assessment) <br /> 4 EMCON installed aboveground piping to vapor extraction wells <br /> 5 EMCON constructed and installed a soil vapor extraction (SVE) system, which includes nine vapor <br /> extraction wells The SVE system consists of a King Buck and Associates MMC-7A catalytic oxidizer <br /> and Dwyer blower <br /> 6 EMCON obtained the authority-to-construct (ATC) permit from the San Joaquin Valley Unified Air <br /> Pollution Control District (SJVUAPCD) <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth- 1996) <br /> 1 EMCON will continue to perform quarterly groundwater monitoring for ARCO The next sampling <br /> event is tentatively scheduled for November 1996 EMCON will collect groundwater samples that will <br /> be analyzed for total petroleum hydrocarbons as gasoline (TPHG), benzene, toluene, ethylbenzene <br /> and total xylenes (BTEX), and methyl-tert-butylether In addition, samples collected from wells MW-2 <br /> and MW-6 will be analyzed for total oil and grease <br /> 2 EMCON will start up and conduct a source test in compliance with the ATC issued by the <br /> SJVUAPCD <br /> Current Phase of Project Remediation <br /> Frequency of Groundwater Sampling Quarter/ <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sample Date August 22, 1996 <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 26 48 to 30 72 <br /> Direction of Groundwater Flow Northeast <br /> Groundwater Gradient 0 002 <br /> SA0N'\PJM80W80514607CS-96,cjb k <br />
The URL can be used to link to this page
Your browser does not support the video tag.