My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001307
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:43:33 PM
Creation date
3/1/2019 4:31:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001307
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date August 8, 1996 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02168 Address 441 Charter Way, Stockton, California _ <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-146 007 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (Second- 1996) <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON observed the backfilling and compaction of the former underground storage tank cavity and <br /> product line trench <br /> 4 EMCON prepared and submitted a workplan to install four additional vapor extraction wells <br /> WORKED PROPOSED FOR NEXT QUARTER (Third- 1996) <br /> 1 EMCON will continue to perform quarterly groundwater monitoring for ARCO The next sampling <br /> event is tentatively scheduled for August 1996 EMCON will collect groundwater samples that will be <br /> analyzed for total petroleum hydrocarbons as gasoline, and benzene, toluene, ethylbenzene, and <br /> total xylenes, and methyl-tert-butylether In addition, samples collected from wells MW-2 and MW-6 <br /> will be analyzed for total oil and grease <br /> 2 EMCON will install four additional vapor extraction wells <br /> Current Phase of Project Remediation <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sample Date May 15, 1996 _ <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 25 79 to 30 09 <br /> Direction of Groundwater Flow Northeast <br /> Groundwater Gradient 0 003 <br /> DISCUSSION <br /> Results of this mondoring event indicate that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events Groundwater gradient Is consistent with previous <br /> sampling events Groundwater elevation Increased approximately 1 67 feet from the previous sampling <br /> event (February 1996) <br /> WIN\PJM805a8051460 7BS-9i\p-L% 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.