My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012561
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0012561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 5:52:50 PM
Creation date
3/1/2019 4:43:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012561
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV <br /> P <br /> 0.F13� 111-1, <br /> EMMA- <br /> _ A__3_ coo <br /> 4PP1100' GeoSystems 4191-E Power Inn Road, Sacrarnemo, CA 95826 (916)45- 901 <br /> FREMONT 0 IRVINE 0 HOUSTON 6 CC,15TON 0 SACV.MENTO a CULVER CITY 0 SAN JOSE <br /> S1 I E SA=.r Fl" RE 31559-15 -- <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No. 2168 <br /> 441 West Charter Way <br /> Stockton, California <br /> (May 2. 199 1) <br /> INTRODUMON <br /> This Site Safety Plan describes basic safety requirements for the subsurface environmental <br /> investigation. The provisions set forth in this Plan apply to the employees of Applied <br /> GeoSysterns and its subcontractors working on this phase of the project. The subcontractors <br /> may 'elect to modify these provisions, bu.t only to upgrade or increase the safety <br /> requirements, and only with the concurrence of Applied GeoSystew.s, as designated and <br /> accepted in writing. <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Field activities are planned to begin upon approval of work <br /> plan by the San Joaquin County Environmental Health Division with the duration estimated <br /> to be approximately 1 month after the start date. If changes in site or working conditions <br /> occur as activities progress,addenda to this plan will be provided by Applied GeoSystems. <br /> AUTHORITY FOR SrM- SAFE11'Y <br /> The Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> and the Staff Geologist or Engineer. The Health and Safety Coordinator is responsible for <br /> the overall Applied GeoSystems Health and Safety Program and may choose to audit the <br /> 6.4 site for compliance and take appropriate action to correct deficiencies. 'Me Project <br /> Manager is responsible for implementing the provisions of this Plan, for providing a copy <br /> of this Plan to the Staff Geologist or Engineer, and for advising the Staff Geologist or <br /> Engineer on healtb and safety matters. The Project Manager and Staff Geologist or <br /> Engineer have the authority to audit site activities for compliance with the provisions of this <br /> 4-0 Plan They may suspend or modify work-,practices or dismiss subcontractors whose conduct <br /> does not meet the requirements specified in this Plan. <br /> The Staff Geologist or Engineer is responsible for communicating the information contained <br /> in this Plan to the Applied GeoSystems personnel assigned to the project and to the <br /> vw responsible representative of each subcontractor working for Applied GeoSystems on the <br /> project. <br /> IMIN Imm =Elmo <br />
The URL can be used to link to this page
Your browser does not support the video tag.