My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012861
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0012861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:15:48 PM
Creation date
3/1/2019 4:44:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012861
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a7rdr!1f�05 10;37 2094683433 <br /> ` EHD PAGE 03 <br /> page 2,441 W.Charter Way <br /> In the Work Plan UR5 proposed the surface completion with traffic rated, flush m <br /> well vaults of the SVI=IAS wells. During a phone conversation on September 2, 2005ed <br /> URS requested on behalf of the Property <br /> below grade, further stating that thein locations would be mapped and they SVE/AS Wells be would ed <br />{ accessible for Proper would be <br /> p per destruction from the surface. In the Addendum URS proposes these <br /> wells will be destroyed by pressure grouting through the remediation <br /> common treatment system compound area. SJC/EHD does notapprove rg located in the <br /> destruction. For proper destruction, the top of the wells must be exposed to the surfacef <br /> and the method appropriate for site conditions must be used, be it pressure grouting with <br /> mushroom cap or Complete overdrilling. <br /> URS did not provide justification for the other changes to the Work <br /> Plan at they <br /> the Addendum. These changes include the installation of an additional tr}oundw ter <br /> made in <br /> monitoring well, art additional dual completed SVE/AS well, and the change in location of <br /> the SVE/AS network of wells. SJC/EHD cannot approve <br /> F Work Plan "hoot explanation,justification or demonstration ion that he sed changes <br /> n ess ofthe <br /> e <br /> r corrective action would not be compromised by the changes, e <br /> If you have any questions please call Lori Duncan at(209)488-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Lori Duncan, Senior REHS <br /> LOP/Site Mitigation Unit IV Nuel C. Henderson, Jr.. PG <br /> LOP/Site Mitigation Unit 1V <br /> cc: .lames Barton, PG, CVRWQCB <br /> Vern Elart <br /> h, PG, URS. <br /> t <br /> �t <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.