My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0013102
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0013102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:15:22 PM
Creation date
3/1/2019 4:47:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013102
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emc®n U <br /> 1433 North Market Boulevard •Sacramento,California 95834-1943 • (916)928-3300+Fax(916)928-3341 <br /> 1W fill f1 <br /> AUG 06 1996 <br /> ENVIRONMENTAL HEALTH August 5, 1996 <br /> PERMIT/SERVICES Project 20805-146.006 <br /> Mr. Kyle Christie ' l <br /> ARCO Products Company V� <br /> Q.O. Box 612530 <br /> San Jose, California 95161 <br /> Re: Re sults of Underground Storage Tank Removal and Overexcavation Activities, <br /> Former ARCO Service Station No. 2168, 441 West Charter Way, Stockton, <br /> California <br /> Dear Mr. Christie: <br /> EMCON is pleased to provide this report presenting the results of underground storage <br /> tank (UST) removal, overexcavation, and on-site soil aeration conducted at the former <br /> ARCO Products Company (ARCO) Service Station 2168, located at 441 West Charter <br /> Way in Stockton, California (see Figure 1). EMCON provided services consistent with the <br /> F October 4, 1995 "Interim Soil Remediation Plan." UST removal, overexcavation, and on- <br /> site soil aeration involved the following activities: <br /> • UST and piping removal performed on February 7, 1996 <br /> • UST cavity overexcavation and compliance soil sample collection performed on <br /> February 8, 1996 <br /> • Overexcavation of the former dispenser and piping areas conducted on <br /> February 13, 1996 <br /> • Discovery and removal of a third set of product piping and possible dispenser <br /> occurring on February 13 and 14, 1996 <br /> • Compliance soil sample collection from the third piping trench performed on <br /> February 14, 1996 <br />{ • Soil stockpile sampling performed on February 8 and 14, 1996 <br /> • Soil aeration activities conducted beginning on April 22 and concluded on May 2, <br /> 1996 <br /> SAL\':W70\0805\08051460.61)S-95,cjh:3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.