My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:03:38 PM
Creation date
3/4/2019 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Californi. 0gional Water Quality Colrol Board <br /> Central Valley Region <br /> Katherine Hart, Chair WR .. <br /> Linda S. Adams (ice- Amold <br /> 11020 Sun Center Drive#200, Rancho Cordova,California 9567tft Il r�'�- warzenegger <br /> Secretary for Phone(916)464-3291 •FAX (916)464-4645 <br /> Governor <br /> Environmental http://www.waterboards.ca.gov/centralvalley <br /> Protection MAR 1 8 2010 <br /> 17 March 2010 ENVIRONMENT HEALTH <br /> Denis Brown Sergio Morescalchi StephanAR&gRVICE$ <br /> Shell Oil Products US Atlantic Richfield Company Chevron Environmental Management <br /> 20945 S. Wilmington Ave. P.O. Box 1257 6111 Bollinger Cyn. Rd., Rm. 3652 <br /> Carson, CA 90810 San Ramon, CA 94583 San Ramon, CA 94583 <br /> LEAD AGENCY STATUS AND DIRECTIVES FOR UNAUTHORIZED RELEASE CASES <br /> NOS. 390268 13906571390876, A T 440(TEXACO - SHELL) /441 (ARCO)/508 (CHEVRON) <br /> W. CHARTER WAY, STOCKTON, SAN JOAQUIN COUNTY <br /> In letters dated 4 March 2010, the San Joaquin County Environmental Health Department referred the <br /> lead agency for the above three cases to the Regional Water Quality Control Board (Regional Water <br /> Board). Upon review of the technical data contained in our files and on the State's GeoTracker <br /> database system, as well as all recent correspondence, significant impacts remain in soil and <br /> groundwater beneath your sites, and continue to be elevated well in excess of both human health and <br /> safety and water quality criteria established to ensure protection of same. As such, additional remedial <br /> efforts clearly need to be conducted. In addition, a review of your commingled plume application is <br /> currently being conducted by State Water Resources Control Board (State Water Board) Underground <br /> Storage Tanks Cleanup Fund staff. In that the State Water Board's commingled plume application <br /> process may take several months to finalize and approve, and the identified contamination that you are <br /> responsible for continues to significantly impact waters of the state and threaten human health and <br /> safety, corrective action work at your site is not to stop. The ARCO remediation system will continue <br /> operations. <br /> Therefore, you are to: <br /> 1. Continue monitoring all wells semi-annually per State Water Board Resolution No. 2009-0042, until <br /> directed otherwise by staff. You are to monitor during the second and fourth quarter of each year, <br /> with reports due the 30th day of the month following the reporting quarter. <br /> 2. Under the commingled plume regulations, a single point of contact and case management is <br /> established. If you have established said contact(s), you are to provide, via email, with said <br /> commingled plume spokespersons/contacts for both correspondence and environmental consultant <br /> interactions. Please supply the requested information by 1 May 2010 <br /> Your next monitoring report is due 30 July 2010. Pending staff receipt of the monitoring report (hard <br /> copy and GeoTracker), the data will be reviewed for additional direction and directives. I recommend <br /> that you and your consultant meet with Regional Water Board staff as soon as possible to discuss the <br /> most appropriate direction to both minimize your costs and to proceed with timely remediation of the <br /> problem. <br /> California Environmental Protection Agency <br /> off Recycled Payer <br />
The URL can be used to link to this page
Your browser does not support the video tag.