Laserfiche WebLink
Table 1. Summary of slug test results <br /> Well Test rb (inch) L (ft) ITO (sec. ) K (cm/sec) I K (ft/day) <br /> MRS out—a 5 15 30. 6 2. 07E-02 59 <br /> out 5 15 43. 0 1. 47E-02 42 <br /> in 5 15 26. 0 2. 438,-02 69 <br /> i n a 5 15 3 4 1. 868-01 _ ]7]:::::- <br /> MW4RD in—c 5 65 3. 0 6. 85E-02 194 <br /> Notes: <br /> rb - radius of borehole (inch) ; <br /> L - length of screen interval (feet) ; <br /> To - basic time lag between ho (maximum head change) and 0. 37ho; <br /> K - hydraulic conductivity in cm/second and feet/day. <br /> �� �t�6wl VO-2 <br /> S - <br /> 1" <br /> 5C <br />