My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative Technical Effectiveness Implementability CostOverall <br /> Effectiveness Ranking <br /> Biosparging Effective in reducing • Easily • Expected to <br /> bulk mass of COPCs in implementable; be moderate High <br /> gravelly,sandy soil layer Should take no based on the <br /> but limited in silty and more than six expected level <br /> clayey soil layer; months after of 0&M <br /> • May take a long time to completion of pilot activities; <br /> achieve target cleanup test and system • Overall cost <br /> goal; design to begin effectiveness <br /> • Overall effectiveness- treatment; - high <br /> moderate • No air or POTW <br /> permits needed, <br /> minimizing lead <br /> time required; <br /> • Overall <br /> implementability- <br /> high <br /> In-situ chemical Effective in reducing • Implementable but Expected to <br /> oxidation bulk mass of COPCs in require a field pilot be high due to Moderate <br /> to high <br /> gravelly,sandy soil layer test to complete amount of <br /> but somewhat limited in system design; oxidant likely <br /> silty and clayey soil • Should take no used and the <br /> layer; more than six need to <br /> • May not take as long a months after address the <br /> time as the other completion of pilot COPC in the <br /> alternatives to achieve test and system silty and <br /> target cleanup goal; design to begin clayey soil <br /> • Overall effectiveness- treatment; layer,along <br /> moderate to high Fewer permits with the <br /> needed than associated <br /> groundwater pump level of 0&M <br /> and treat and air activities; <br /> sparging with SVE Overall cost <br /> -less lead time effectiveness <br /> before treatment -moderate <br /> begins; <br /> • May require <br /> additional system <br /> control measures <br /> depending on <br /> permit <br /> requirements; <br /> • Overall <br /> implementability- <br /> moderate to high <br /> Based on the results of the comparison among the alternatives on technical effectiveness, <br /> implementability, and` cost effectiveness, biosparging should be the preferred treatment <br /> alternative for the site. <br /> FS_OnsRe Petroleum Hydrocarbon Remediation.doc 5_2 <br /> Shaw Environmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.