My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO ME <br /> NTAL �IEALTHl DEPARTMENT <br /> Pa��N SAN JOAQUIN COUNTY <br /> U): <br /> Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> Program Manager Douglas W.Wilson,R.E.H.S. <br /> ��FORS Laurie A.Cotulla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> DONALD F. RODGERS <br /> 11900 S UNION ROAD <br /> MANTECA CA 95336 <br /> RE: The Transmission Shop Site Code: #9321 <br /> 515 W.Charter Way <br /> Stockton CA 95206 <br /> WORK PLAN: Groundwater Monitoring Well Installation Work Plan <br /> DATED: March 13,2002 <br /> PREPARED BY: IT Corporation <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUM NEEDED: x Submit by: April 15,2002 <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37,subd(c)(3)]: <br /> 1. Installation of two shallow groundwater monitoring wells for lateral assessment of the shallow contaminant plume. <br /> 2. Installation of one direct push,continuous core,Geoprobe boring for vertical assessment of the contamination <br /> onsite in both soils and groundwater. The boring will be advanced to 80-feet below surface grade(bsg),one grab <br /> groundwater sample will be collected at total depth. <br /> 3. A minimum of three soil samples from each boring will be submitted for laboratory analysis. <br /> 4. All samples will be analyzed for TPHg,BTEX and fuel oxygenates by appropriate EPA approved methods. <br /> COMMENTS AND CONDITIONS• <br /> 1. Per SJC/EHD 01/02/02 directive,deep monitoring wells must be installed. Submit an addendum for the installation <br /> of deep monitoring wells;details of construction pending analytical results from the deep direct push boring. <br /> 2. Feasibility testing for groundwater remediation methods must be addressed. Include this in the addendum. <br /> 3. Soil samples from below 40-feet bsg must be submitted for laboratory analysis. <br /> 4. Sample analysis of both soils and groundwater must include 1,2-dichloroethane and ethylene dibromide. <br /> 5. A report of findings must be submitted to SJC/EHD within 60-days following completion of all fieldwork. <br /> 6. Access agreements from offsite property owners must be submitted before SJC/EHD boring permits can be issued. <br /> 7. Forty-eight hours notice to SJC/EHD is required before any site fieldwork. <br /> DATED I Z Z'(� BY <br /> Lori Duncan.Senior REHS (209)468-0337 <br /> cc: Marty Hartzell,CVRWQCB <br /> Kathleen Waldo,IT Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.