Laserfiche WebLink
JUL-06-98 09:44 AM RODGERS CONSTRUCTION 209 464 5782 P.02 <br /> State Water Resources Control Board QP <br /> John P. Caffrey,Chairman <br /> Peter 1i.Roonc� Pete Wilson <br /> Secretam7 fc.w Governor <br /> EncironmcFaal Division of Clean Water Programs <br /> Prorectiou 2014 T Street,Suite 130•Sacramento,Calil'omia 95814•(916) 227-0744 rA\(916)227-4530 <br /> Mailing Address: P.O.Bos 944212•Sacramcn1o,Calitbrnia•94244.2120 <br /> lnternct Address fittp'"wµw.stcrch ca gov%—cw'phomc.'ustcC.'fundhctmc.hhn <br /> June 30, 1998 <br /> Mr. Don Rodgers <br /> 11900 South Union road <br /> Manteca, CA 9336 <br /> Dear Mr. Rodgers: <br /> REQUEST FOR PRE-APPROVAL OF CORRECTIVE ACTION COSTS,CLAIM NO. 11508, <br /> S1TF, ADDRESS: 551 WEST CIIARTER NN'AY, STOCKTON, CALIFORNIA <br /> I am returning your consultants request for pre-approval for installation of a Soil Vapor <br /> Extraction System letter faxed June 29, 1998. <br /> As of this review, you are not in compliance with the Fund's three bid minimum requirement. <br /> You are required to obtain consultant/contractor bids as necessary during your corrective action <br /> project, for both investigation and remediation. Per Fund Regulation 2812.1(b), the claimant <br /> must obtain at least three written proposals for corrective action work not contracted prior to <br /> December 2, 1991. Since this requirement has not been met, fonnal preapproval has been <br /> denied. <br /> r` <br /> V The following items must be submitted in order for the Fund to review your pre-approval <br /> request. <br /> 1) Cost Pre-approval Request form completed by the claimant. <br /> 2) A completed signed copy of the approved Investigative Workplan (lP or Corrective <br /> Action Plan (CAP) (as defined and required by Article 11,Chaptcr 16, California <br /> �ll Underground Storage Tank Regulations). The CAP must include the required feasibility _ <br /> study and chosen cost-effective alternative. Sc P►` � 'J <br /> 3) A signed copy of the oversight agency letter of direction and approval of work plan <br /> letter for the IPICAP as it is submitted to the Fund. S �' <br /> 4) A complete copy of the Request for Bids, including all attachments. A list of all firms )(�L <br /> requested to bid, must be included. 1Q <br /> 5) Complete copies of all bids and other correspondence submitted in response to the <br /> Request for Bids, <br /> 6) A copy of time schedule, if not pail of bid documents, anticipated for project initiation U <br /> and duration. YY1 <br /> 7) A copy of the detailed project budget,which includes breakdowns of staff/taskfhour S �J`q� <br /> 1' �9 <br /> with associated estimated totals. <br /> California Environmental Protection Agencj, <br /> 0% Recycled raper <br /> L <br />