Laserfiche WebLink
• EVENT SUMMARY <br /> TO: David Herzog, Project Manager „DATE 02/17/03 y <br /> Sacramento Office <br /> FROM Sheila Richgels, Sampling Cooid <br />' Saciamento Office <br /> RE: Don Rodgeis— 1st Qtr 2003 Sampling Event <br /> Field sheets are attached for the quarterly sampling performed at the Don Rodgers site <br /> Four of the five site wells were sampled on 02/11/03 by Paul Weinhaidt Well VW-1 <br /> was dry and not sampled Sampling was coordinated with Blaine Tech and Gettler-Ryan <br /> Lori Duncan was notified prior to the event <br /> Puige water (88 5 gls) was pumped into the office tank for disposal later by ABCO <br /> Samples were shipped to CAS, Redding via Golden State Coutiet on 02/11/03 <br /> • <br />