My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 5:53:12 PM
Creation date
3/4/2019 2:07:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Laurie A. Cotulla <br /> December 5, 1990 <br /> Page 2 <br /> The titles and formats of the reports submitted to date do not reflect routine Quarterly Monitoring <br /> Report submittals; however, the appropriate monitoring and status information was submitted for the <br /> monitoring events conducted through September 1990 in the context of the Supplemental Data Report <br /> submitted October 8, 1990. <br /> Continued free product recovery and quarterly monitoring are being conducted by Delta at the <br /> referenced site. In the future,beginning with First Quarter 1991 data, Quarterly Monitoring Reports <br /> will be submitted in the format referenced in your November 26,_1990,letter. <br /> A Final Remedial Plan is currently being finalized by Delta. However, it will not be possible to <br /> accomplish all technical reviews of the draft document to allow submittal of the Final Remedial Plan <br /> by January 11, 1991. Shell technical personnel have advised me that full technical review by Shell <br /> remediation engineers and hydrogeologists can be accomplished by the end of January 1991. Therefore, <br /> we are requesting that the draft Final Remedial Plan submittal date be changed from January 11, 1991 <br /> to January 31, 1991. <br /> Mr.Lee Brennan,the former Delta Project Manager for this site no longer works for Delta. Mr.Henry <br /> m II <br /> DihI,P.E.,has been assigned project management responsibilities for this'project. Please address <br /> any questions regarding data submitted to date to either Mr.D'hm or me at (916) 638-2085. <br /> Sincerely, <br /> DELTA ENVIRONMENTAL CONSULTANTS,INC. <br /> Barbara J. Mickelson, P.E. <br /> District Manager <br /> BJM:mjd <br /> Enclosure <br /> cc/enc: Mr. Jack Brastad, Shell Oil Company <br /> Mr. Henry Dihm, Delta Environmental Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.