Laserfiche WebLink
ris 'P� <br /> inches above and six inches below the top of the-cut-off casing: The upper 2 feet will be <br /> �,� <br /> filled with concrete or asphalt to match the�surrounding grade. <br /> 2.5 WASTE DISPOSAL <br /> Drill cuttings and any liquids generated during the work will be stored in a covered bin <br /> or 55-gallon drums, labeled, and sealed for temporary onsite storage pending receipt of <br /> analytical data for disposal profiling. Upon approval, the waste will be transported to <br /> an appropriate disposal facility. <br /> 2.6 REPORT PREPARATION <br /> Following completion of the well destructions, CRA will submit a brief report <br /> documenting the activities. A Department of Water Resources (DWR) Well Completion <br /> Report form will be completed for each of the destroyed wells and will be submitted to <br /> DWR under separate cover. <br /> 3.0 SCHEDULE <br /> CRA will implement the well destructions upon approval of this work plan and permits <br /> by SJCEHD and the City of Stockton Public Works Department. CRA will contact <br /> SJCEHD's Permits Section to schedule the drilling dates. _ <br /> 514077A nay 3 CONESTOGA-ROVERS&ASSOCIATES <br />