My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 6:55:51 PM
Creation date
3/4/2019 2:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Equilon Enterprises `"'� -3- February 22, 2010 <br /> Claim No. 4954 <br /> IV. MAXIMUM DOCUMENTED CONTAMINANT CONCENTRATIONS <br /> Contaminant• ", Soil m /k ;: Water u /L 1NQOs, <br /> Maximum Latest. Maximum Latest (ug/L) <br /> - - - . . <br /> TPH79 NA NA FP 4,700 5 <br /> TPH-d NA NA FP NA 56 <br /> Benzene NA NA FP 59 0.15 <br /> Toluene NA NA FP 5.7 42 <br /> Eth (benzene NA NA FP 3.2 29 <br /> Xylenes NA NA FP 16 17 <br /> MTBE NA NA FP 180 5 <br /> TBA NA NA FP 330 12 <br /> 1,2-DCA _ _NA—- NA_,_— --FP--- _ __69 <br /> Lead NA NA FP . NA 15 <br /> PCE NA NA NA NA 0.06 <br /> TCE NA NA NA NA 0.8 <br /> NA Not Analyzed,Not Applicable,or Data Not Available <br /> WQO, Water Quality Objectives <br /> FP Free phase product in site wells <br /> V. FREE PRODUCT: MW-2 contained up to 0.37' of free-product(Jul 92), MW-4 <br /> - contained up to 0.18' of free product (Jul 92), MW-land MW-3 contained free product. <br /> IN Apr 90 a product;skimmer was installed in.MW-2 and later in MW-7. -- 74'.:) <br /> ` - <br /> , <br /> VI. SOIL'AND GROUNDWATER REMEDIATION <br /> A. Soil Excavation: unknown volume <br /> , <br /> B. In-Situ Soil Remediation: <br /> • METHOD: soil vapor extraction <br /> • DURATION: Sep 92 through Nov 96 <br /> • MASS REMOVED: 14,900 pounds of TPH-G <br /> C. Groundwater Remediation: none identified <br /> • I <br /> I <br /> California Environmental Protection Agency <br /> P.a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.