Laserfiche WebLink
R <br /> EQUINA WELL MONITORING DATA SHEET <br /> Job rr L S �' <br /> Project # 1 <br /> Sampler- � S <br /> Date I <br /> Well Diameter* 2 3 6 $ <br /> Well T.D M w r j <br /> 11 Depth Depth to Water <br /> Total We p <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to PVC Grade <br /> D O Meter (if req'd) Ysl HACH <br /> Well ptameter Multi Ip ter <br /> Well Diameter titult�lte; 1 02 <br /> 0 16 5' <br /> 037 6- l 47 <br /> 3radius R 0 163 <br /> a• <br /> 065 <br /> Otho <br /> Batter Sampling Method Bailer <br /> Purge Method Extraction Port <br /> Middlcb= <br /> ectric Submersibl <br /> Other <br /> Extraction Pump <br /> Other <br /> 3 - � Gals <br /> IDS eci�ea Vottunes Calculated Volume <br /> I Case Volume (Gals P <br /> Time <br /> Temo ("F) pH Cond Turatdav Gais Removea Obse^iauon�, <br /> I0' 3 2 CD I <br /> 1 <br /> I <br /> I , <br /> DIG well dewate1 <br /> -9 Yes No Gallons actually evacuated <br /> 5-3 <br /> Sampling Time <br /> � 1 Sampling Date E/ 12 <br /> j 4 5 <br /> tSample I D V�/ Laboratory quotaBC Othe-vITBE TP { the"zed for TPH-G BTEC m%me, <br /> Pre- Post-purge <br /> D p (1.t req t1) <br /> OR P (if req'd) Pre-purge mV Post-purge i <br />