Laserfiche WebLink
SHELL WELL MONITORING DATA SHEET <br /> BTS # Q 3^ �a3�� Site' �00,9 bid r ILC r -0c <br /> S ter Date. 8-23 -©1? <br /> Well I D_: _ Z Well Diameter 3 4`*! G S <br /> Total Well Depth (TD) ,(, Depth to Water (DTW). If,742 <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Pvc Grade D.O Meter (if req'd): YSt HACH <br /> DTW with 80% Recharge [(Height of Water Column x 0.20) +DTW] Z <br /> Purge Method Bailer waterra Sampling Method Bader <br /> Disposable Bailer Peristaltic Disposable Bailer <br /> Middleburg Extraction Pump Extraction Port <br /> ectrlc 5ubmersib elel Other Dedicated Tubing <br /> Other. <br /> Well Diameter Mulliplier We11_Dinmeter rviultiplier <br /> 1� `7 1" 0.04 4" 0 65[ / (Gals.)x 3 Gals. 2" 016 W. 147 <br /> 1 Case Volume Specified Volumes Calculated Volume " 0,37 Otho rndittsx'0 163 <br /> Cond. Turbidity <br /> me Temp ((F) pH (ms or tS (NTUs) Gals. Removed Observations <br /> o. l (0 '-I r17 r <br /> Z 70. '7• ) 501(.f T ea 0 Z <br /> (Zqg ? 7. D J S <br /> Did well dewater? Yeso Gallons actually evacuated: <br /> Sampling Date: Sampling T€rne: l p Depth to Water. Z <br /> Laboratory. Kik SPL Other <br /> Sample LD o4 W � Z ry• <br /> Analyzed for. TPH-G BTEXMTBE TPH-D Other <br /> CB I D (if applicable): `i nme Duplicate I D. (if applicable): <br /> 4nalyzed I'or• TPN-G BTEX MTBE TPH-D Other <br /> DO (ifreq'd)- Pre-purge: mg/L Post-purge- mglL <br /> . (if req'd): Pre-purge: nzV Post-purge* 131V <br /> Blafne Tech Services, Inc. i 6Bo Rogers Ave., San Jose, CA 95112 (800) 545-755B <br />