My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001142
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
ARCHIVED REPORTS XR0001142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 9:56:32 PM
Creation date
3/4/2019 3:39:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001142
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEQUOIA ANALYTICAL <br /> 680 Chesapeake Drive • Redwood City, CA 94063 <br /> (415) 364-9600 • FAX (415) 364-9233 <br /> Delta Environmental Consultants Client Project ID 620 W Charterway, Shell <br /> 3330 Data Drive <br /> Rancho Cordova, CA 95670 <br /> Attention Scott Romine OC Sample Group 2014651 -55 Reported Feb 7, 1992 <br /> QUALITY CONTROL DATA REPORT <br /> ANALYTE Ethyl- <br /> Benzene Toluene Benzene X enes <br /> Method EPA 8020 EPA 8020 EPA 8020 EPA 8020 <br /> Analyst J Villar J Villar J Villar J Viilar <br /> Reporting Units N9/L pg/L pg/L Y8/L <br /> Date Analyzed Feb 3 1992 Feb 3, 1992 Feb 3, 1992 Feb 3, 1992 <br /> OC Sample # GBLK020392 GBLK020392 OBLK020392 GBLK020392 <br /> Sample Cone.- N D N D N D N D <br /> Spike Cone <br /> Added: 10 10 10 30 <br /> Cone Matrix <br /> Spike- 11 11 11 33 <br /> Matrix Spike <br /> % Recovery 110 110 110 110 <br /> Cone. Matrix <br /> Spike Dup 10 10 10 31 <br /> Matrix Spike <br /> Duplicate <br /> % Recovery. 100 100 100 103 <br /> Relative <br /> %Difference 95 9 5 95 63 <br /> )SEQUOIA <br /> 3 <br /> )SEQUOIA ANALYTICAL %Recovery Conc of M S -Conc of Sample x 100 <br /> Spike Conc Added <br /> Relative%Difference Conc of M S -Conc of M S D x 100 <br /> Made A Springer (Gonc of M S + Conc of M S D)/2 <br /> Project Manager 2014649 DLT <4> <br />
The URL can be used to link to this page
Your browser does not support the video tag.