Laserfiche WebLink
r. •.s <br /> Mr. Swaran Chouhan <br /> 701 E. Charter Way, Stockton <br /> Page 2 of 2 <br /> The 28 September 2005 letter also contained a directive to submit to EHD by <br /> 14 November 2005 notification that the remaining scope of work proposed in the <br /> 16 July 2002 work plan as verbally modified on 19 August 2002 was to be <br /> implemented within 60 days of 28 September 2005, or a work plan addendum to <br /> modify the approved scope of work. EHD has not received either document. As <br /> noted above, EHD believes your plume of dissolved contaminants to be unstable <br /> and likely to be migrating off site, therefore the characterization of that plume <br /> must proceed in a timely manner. You are therefore directed to submit the <br /> notification or revised work plan with a proposed schedule for completion within <br /> 14 days of date of this letter. <br /> Questions or comments may be directed to Nuel Henderson by mail (address on <br /> letter head) or by telephone at (209) 468-3436. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> -OC/4� -Ilollad7y <br /> Nuel C. Henderson, Jr., PG Margare Lagorio, REHS <br /> Engineering Geologist, Unit IV Supervisor, Unit IV <br /> cc: James L.L. Barton - CRWQCB <br /> Dr. Calvin Lee - AGE <br />