My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
3500 - Local Oversight Program
>
PR0544217
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:05:25 PM
Creation date
3/4/2019 4:26:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544217
PE
3526
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
02
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ita <br /> Sohin <br /> Multichannel Tubing Seals & Packers <br /> .A multilevel well that uses a continuous length of The CMT tubing can he sealed in dace with sand and <br /> multichannel tubing has the advantage over other bentonite lavers in the usual manner using a trernie pine <br /> muitileveis in that there are no icints. 1 pis significantly or with the Solinst Mini Sand Bentonite iniec-or, Mode: <br /> reduces the cost of installing wells and at the same time 561M. if the appiication is in loose sands. direct burial <br /> increases the reiiaoflity of the system. 1 ne CMT tubing can be used, allowing the sand to ceilapse arouna the <br /> is very simpie and convenient to Lse, as it gives full tubing. P-e-packed bentonite seals are also available <br /> :lexibiiity as to where monitoring zones are located,and which have bentonite pellets inside a 'plastic mesh, so <br /> length ngth of ubing can Ice used for a number or well that they can be slipped onto the tubing and then <br /> installations. It `las a ridge down its entire 'length to clamped quickly in place prior to installation. <br /> allow for easy ieentification of specific channels. <br /> Ports and packers can 'oe assembled onto the tubing in <br /> the field, immediareiy after drilling,to reduce open hole <br /> time ind potential cross-contamination between zones. <br /> h �t wi <br /> Pear Aew,i <br /> --AT Tuning - <br /> _'�-./• <br /> ?re-packed 3enronue Packer .Double-Acting Packers <br /> �iaae - Double-Acing inflatable Packers` are ideal for use in <br /> sttuaricns where a CMT System is to be put '.nide an <br /> ^ existing casing, or in a smooth rock borehole nd wnert <br /> x' Pon rnet Holes i removal or the system for decommissioning -eu<_e is <br /> X� I important. <br /> io Double Acting Packers nave a rubber gland or.;he inside <br /> as well as the outside. Both glands inflate and deflate at <br /> Poivetliviene I I the same time. When a vacuum s applied to a paciken <br /> ,.i Melt Seat - <br /> the inner gland retracts and the packer slides easily into <br /> =oam Plug I position on the CMT tubing. <br /> Air gent Hole The vacuum is then released so that the pacxer grins <br /> onto the tubing and a clamp top and bottom ensures <br /> ' that the packer does not shift position during instailarion. <br /> To creare a port: cnannei a seaiea; holes are drilled into <br /> he tubing and covered?y a stainless steel screen or <br /> Pre-Packed sand panto. <br /> Kc <br /> Pow <br /> -he number ani vocation or crts may oe ceiermined in <br /> advance of drilling, or arter coring, toles ar., drilled in <br /> = vertical ;ine into a given channel at a -oecneiJ iepth <br /> according to the zone to be monitored. ror.-ntrg a ^ort. <br /> ne-panne:is seated with a.olyethviene Natant oeiow ' <br /> the port openi-�gs and a vent hole is lert iusi below the W �* <br /> seal to allow ai:tc escape as the system is lowerec into .b. <br /> the role. Infladn;the <br /> A sminiess steel mesh is fixed in place over the port to =pplyin;a Sliding the packer Double-Acting <br /> vacuum into position Packers <br /> prevent fines from enterrig, or pre-packec sang packs <br /> are clamped onto the tubing over the hoies. 'he screen The packers are ccrnnected in line with flexible inflation <br /> kits come in a variety of mesh sizes, complete with tubing, and after installation into the well an inflation <br /> clamps, hot melt polyethylene glue and plugs. vessel is filled with water and an air source is used <br /> "ach channel is sealed at the 'oottom to prevent cross hydraulically inflate the packers. <br /> contamination. and a vent hole is cut into the c`annei Systems using Double Acting Packers can easiiv be <br /> jus: below -he port. This allows water from the removed and the packers used eisewhere or in some <br /> monitoring zone to fill the channel beicw the zonecases the system may be repositioned so that the port <br /> avoiding buoyaneJ. are located at different depths within the same well. <br /> Patents Pending <br /> High Quality Groundwarer Monitoring Insn-umentation Irlst <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.