My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
3500 - Local Oversight Program
>
PR0544217
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:05:25 PM
Creation date
3/4/2019 4:26:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544217
PE
3526
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
02
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l .� <br /> 18 May 2001 <br /> AGE-NC Project No. 97-0326 <br /> Page 3 of 3 <br /> Due to the high concentrations of contaminants encountered in the current existing wells and the <br /> February 2001 CPT survey, additional wells will be necessary to adequately assess and monitor <br /> ground water,as stated in the October 2000 work plan;the eventual placement of additional ground <br /> water monitoring wells will be based on the results from the two CPT surveys. Procedures for the <br /> advancement of borings and the installation and sampling of the monitoring wells were described <br /> in the Monitoring Well Installation Work Plan.However,AGE recommends that monitoring wells <br /> be installed in clusters based on the results of the February 2001 CPT survey, which assessed <br /> hydrocarbons in ground water samples collected from deeper depths. The water-table wells will be <br /> designed as proposed in the July 1998 work plan.The deep well design will be provided to the PHS- <br /> EHD in a work plan addendum and will be based on complete results of the CPT investigation. <br /> Encroachment and access permits will be obtained from the City of Stockton,and access agreements <br /> will be obtained from the owners of 721 East Charter Way prior to commencement of drilling on <br /> their respective properties.Any additionally required drilling permits will be obtained from the PHS- <br /> EHD. A Site Health & Safety Plan is currently on file with your office for the referenced site. <br /> Please contact our office at (209) 467-1006 if you have any questions or comments. <br /> Sincerely, <br /> Advanced GeoEnviron mental, Inc. <br /> Calve ee <br /> Project Geologist <br /> cc: Mr. Khaldoon Othman - K&S Gas & Grocery <br /> Advanced GeoEnviron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.