Laserfiche WebLink
I <br /> Site Background information K& S Gas & Grocery <br /> • Page 2 of 5 <br /> detected at a depth of 45 feet bsg or In samples analyzed from the three other borings Soil probe <br />' boring installations were described in theAGE-prepared Preliminary Site Assessment Report in <br /> August 1997 <br /> One 20,000-gallon UST was Installed at the site following the 1998 UST removals Approximately <br /> 341 tons of hydrocarbon-unpacted soil were excavated during removal of the old USTs and over- <br /> excavation for the installation of the new UST and piping Soil was disposed of at Forward Landfill <br /> During the UST installation, two conductor casings were installed through the pea gravel adjacent <br /> to the UST in anticipation of future site assessment needs The UST removal, over-excavation,and <br /> UST installation were described in the AGE-prepared UST Removal Report, dated 26 May 1998 <br /> Three ground water monitoring wells(MW-1 through MW-3)were installed in December 1998 as <br /> part of site assessment activities Petroleum hydrocarbon-impacted soil was encountered in all well <br /> borings The maximum concentration of TPH-g was 4,200 mg/kg (MW-1) Benzene and MTBE <br /> were detected only in soil sample MW2-35 at 0 0058 mg/kg and 0 011 mg/kg, respectively <br /> TPH-g was detected in Initial ground water samples collected from MW-1 through MW-3 at a <br /> maximum concentration of 330,000 micrograms/liter (µg/1) in the sample from MW-3 BTEX <br /> • compounds were detected at concentrations as high as 29,000 gg/l benzene, 54,000 µg/1 toluene, <br />' 6,500 µg/1 ethylbenzene, and 36,000 µg/1 xylenes (MW-3) MTBE was detected in all three well <br /> samples at a maximum concentration of 510[.g/1(MW-1) In addition,TBA was detected in MW-1 <br /> and MW-2 at a maximum concentration of 830 gg/l(MW-1) Monitoring well Installation and initial <br />' monitoring activities were described in the AGE-prepared Monitoring Well Installation Report, <br /> dated 02 June 1999 <br /> Between February andNovember 2001,AGE advanced five paired cone penetrometer testing(CPT) <br /> soil borings(CPT-1 through CPT-5)at the site to depths between 100 feet and 150 feet bsg to assess <br /> the extent of petroleum hydrocarbon impact and to identify potential hydrologic units TPH-g was <br /> detected in grab ground water samples at concentrations as high as 14,000 gg/l (CPT-4), BTEX <br /> compounds were detected at concentrations as high as 4,000 gg/l (benzene, CPT-4), MTBE was <br />' detected at concentrations as high as 1 3 gg/l(CPT-4), TBA was detected at concentrations as high <br /> as 5 0 gg/l (CPT-2) <br />' Based on CPT data,AGE developed a hydrogeologic model for the site consisting of a vadose zone <br /> and six potential hydrologic units informally Identified as Hydrologic Unit I (HUI), located <br /> between 30 feet and 70 feet bsg,Hydrologic Unit 2(HU2), located between 70 feet and 85 feet bsg, <br /> tHydrologic Unit 3 (HU3), located between 85 feet and 95 feet to 100 feet bsg, Hydrologic Unit 4 <br /> (HU4), located between 95 feet to 100 feet and 120 feet bsg, Hydrologic Unit 5 (HU5), located <br /> between 120 feet and approximately 135 feet bsg, and Hydrologic Unit 6(HU6), located between <br />' 135 feet and at least 150 feet bsg Geologic cross sections A A' and B-B'were generated from the <br /> CPT data, depicting the Informal hydrologic units and petroleum hydrocarbon concentrations <br /> 1 Advanced GeoEnvironmental,Inc. <br />