Laserfiche WebLink
DARPETRO EXXON <br /> 749 E CHARTER WAY <br /> 2/21 /95 Meeting with John Cussen of California Geophysical Group , John Listen of <br /> Darpetro Ekon and myself. We discussed the groundwater plume and soil <br /> contamination at the site and the presumed plume from 701 E. Charter . The <br /> sampling order for the wells is 11 , 10,6 ,7 ,4,9, 8 , 5 . John agreed to have survey <br /> marks installed on the well casings . <br /> I told John that I have not received a copy of the January quarterly report. John <br /> had a copy of the report with him. The conclusion of the report is to conduct <br /> remediation even though the presumed 701 E Charter plume may be affected. I <br /> told John PHS/EHD would concur with this conclusion and ask for a workplan <br /> within 30 days . <br /> I told John that in order for PHS/EHD to put 701 E Charter in the LOP program <br /> we need more conclusive data than BM-9 . John said he will discuss that issue <br /> with Elizabeth Thayer. <br />