Laserfiche WebLink
WORK DESCRIPTION <br /> Task 1 . Review UST Records and Perform UST System Inspection <br /> The potential for an ongoing release at the site will be investigated by evaluating the UST system <br /> integrity. The UST system will be evaluated through review of records and inspections. <br /> The UST records review will include the following: <br /> • Annual Monitoring System Certification records; <br /> • Repairs and maintenance records; <br /> Records of any water pumped out from the tanks; and <br /> • Records of product or water removed from the sumps, spill containment boxes, and dispenser <br /> containment boxes. <br /> The UST inspection activities will include the following: <br /> • All monitoring equipment will be checked, including all sensors, and line leak detectors; <br /> • Spill containment boxes will be checked for the presence or indication of spills; <br /> • Dispenser pans (Bravo Boxes) will be checked; <br /> • Sumps will be checked for the presence of product, corrosion, or indications of product release; <br /> • Turbine pumps will be checked for any visible signs of product releases, and; <br /> c. <br /> • Overfill prevention devices will be checked for functionality. <br /> Quik Stop Market Inc. ' s UST maintenance contractor will perform the above UST inspection <br /> activities, and a representative will be on site to observe. The SJCPHS-EHD will be notified in <br /> advance of the inspection activities so that they also may be present to observe, if they desire. <br />