My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:50:04 AM
Creation date
3/5/2019 9:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M Rodger Liston <br /> Darpetro Inc. <br /> 749 E. Charter Way, Stockton, California <br /> Page 2 of 2 <br /> • Delineate impacted soil and ground water south of VW-5 ; <br /> • Install ground water monitoring wells screened below 65 feet bsg ; and <br /> • Delineate the vertical extent of impacted groundwater. <br /> These issues still need to be addressed . EHD withholds approval of installation <br /> of the additional monitoring well at this time to give you an opportunity to address <br /> all these issues in a more comprehensive work plan . Your consultant has <br /> requested a meeting with EHD and CVRWQCB personnel , which may be useful <br /> for discussing the open issues on the site and planning the scope of work to be <br /> covered by the revised work plan . Please schedule this meeting with EHD as <br /> soon as possible. <br /> The revised work plan , prepared in the context of a site conceptual model and <br /> addressing the issues noted above, should be submitted to EHD by <br /> 16 June 2003 . If there is any confusion on any of these issues , please call the <br /> undersigned for clarification . <br /> EHD desires to assist you and/or your consultant in this matter as much as <br /> possible . Questions or comments may be directed to Nuel Henderson by mail <br /> (address on letter head ), by e-mail at nhenderson@sjcehd .com , or by telephone <br /> at (209) 468-3436 . <br /> Donna Heran , REHS , Director <br /> Environmental Health Division <br /> Vt <br /> Nuel C. Henderson , Jr. , RG Margare agoric ,R <br /> Unit IV - Site Mitigation Unit IV Supervisor <br /> cc: James Barton - CVRWQCB <br /> John Cussen — California Geophysical Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.