Laserfiche WebLink
M Rodger Liston <br /> Darpetro Inc. <br /> 749 E. Charter Way, Stockton, California <br /> Page 2 of 2 <br /> • Delineate impacted soil and ground water south of VW-5 ; <br /> • Install ground water monitoring wells screened below 65 feet bsg ; and <br /> • Delineate the vertical extent of impacted groundwater. <br /> These issues still need to be addressed . EHD withholds approval of installation <br /> of the additional monitoring well at this time to give you an opportunity to address <br /> all these issues in a more comprehensive work plan . Your consultant has <br /> requested a meeting with EHD and CVRWQCB personnel , which may be useful <br /> for discussing the open issues on the site and planning the scope of work to be <br /> covered by the revised work plan . Please schedule this meeting with EHD as <br /> soon as possible. <br /> The revised work plan , prepared in the context of a site conceptual model and <br /> addressing the issues noted above, should be submitted to EHD by <br /> 16 June 2003 . If there is any confusion on any of these issues , please call the <br /> undersigned for clarification . <br /> EHD desires to assist you and/or your consultant in this matter as much as <br /> possible . Questions or comments may be directed to Nuel Henderson by mail <br /> (address on letter head ), by e-mail at nhenderson@sjcehd .com , or by telephone <br /> at (209) 468-3436 . <br /> Donna Heran , REHS , Director <br /> Environmental Health Division <br /> Vt <br /> Nuel C. Henderson , Jr. , RG Margare agoric ,R <br /> Unit IV - Site Mitigation Unit IV Supervisor <br /> cc: James Barton - CVRWQCB <br /> John Cussen — California Geophysical Group, Inc. <br />