Laserfiche WebLink
Process 3 <br /> Diluting the MtBE and other oxygenates by natural attenuation is a slow process, it wound require <br /> at least 10 years reducing the contamination to a level under the acceptable California Standards. <br /> This is the most economical process but the time of dilution would be beyond the acceptable time <br /> limit. Therefore, we do not recommend this process. <br /> VI Remedial Action Conflicts <br /> The main conflict between the three processes is time and cost. Using the C-Sparger System with <br /> locating it and placing it on site would be the system I would recommend to clean up the <br /> groundwater contamination . <br /> If there are any questions please call me. <br /> Yours truly, c�� 61 r cu {�� <br /> John Cussen <br /> RG #6505 " <br /> �OFrs��r�0s��P <br /> Incl . 2 Cross-sections <br /> 6 <br />