Laserfiche WebLink
rr -. <br /> Water Testing <br /> EPA 8260 for MtBE, TAME , ETBE, DIPE, TBA, 1 -2 DCA and 0. 5 and 20 ug/L <br /> EDB <br /> EPA 8020 and 8015 for BTEX and TPH 0. 3 and 50 ug/L <br /> SCHEDULING <br /> Once this work plan is approved by the San Joaquin Health Department the following schedule of <br /> activities will proceed as follows : <br /> Obtain Drilling Permits and Permission to Drill on Private Property 4 weeks <br /> Drill and Install Monitoring Wells 1 week <br /> Drill and Sample 1 borings 1 week <br /> Reduce Data and Prepare Report 6 weeks <br /> Yours truly, Q�v�SSNPHDC�f <br /> 2 <br /> No, 6566 <br /> /John Cussen <br /> RG #6506 <br /> OFCAlI��N`P <br /> DISTRIBUTION <br /> Mr. Roger Liston, Darpetro, Inc. <br />