Laserfiche WebLink
Water Testing <br /> EPA 8260 for MtBE , TAME, ETBE, DIPE, TBA, 1 -2 DCA and 0.5 and 20 ug/L <br /> EDB <br /> EPA 8020 and 8015 for BTEX and TPH 0.3 and 50 ug/L <br /> SCHEDULING <br /> Once this work plan is approved by the San Joaquin Health Department the following schedule of <br /> activities will proceed as follows : <br /> Obtain Drilling Permits and Permission to Drill on Private Property 4 weeks <br /> Drill and Install Monitoring Wells 1 week <br /> Drill and Sample 1 borings 1 week <br /> Reduce Data and Prepare Report 6 weeks <br /> QED <br /> Yours truly, Q�c��S�aHoc Fp�Ocs <br /> o� 0 u.. <br /> y <br /> Na. 5506 <br /> v John Cussen <br /> RG #6506CALIFfl��\* <br /> DISTRIBUTION <br /> Mr. Roger Liston , Darpetro , Inc. <br />