Laserfiche WebLink
In July 1999 , we drilled an additional monitoring well BM- 12 to 80 feet. This was reported in our <br /> report dated August 5 , 1999 . <br /> In November 2000 two borings B-2 and B-3 were drilled and on December 7 , 2000 one monitoring <br /> (BM-13) well was drilled . This was reported in our Drilling Activity Report dated December 14, <br /> 2000 . <br /> INTRODUCTION <br /> The Environmental Health Dept. of San Joaquin County (EHD) letter dated April 13 , 2004 <br /> requested a work plan be presented to define the vertical and lateral limits of the unauthorized <br /> release at this station . The lateral extension has been defined, except for the area from the site <br /> property to the south side of Charter Way. We talked with the City of Stockton and they informed <br /> us that it is not permitted to drill a well in the traffic lanes of Charter Way. There are two sewer <br /> lines located on Charter Way , (shown on a map) in the area south of the old tank pit on our site . <br /> There also is a large telephone line conduit along the south side of Charter Way. <br /> In October 1994 we attempted to drill a monitoring well on the south side of Charter Way. We had <br /> this well site checked by U S Alert and they advised us that drilling was not possible on the south <br /> side of Charter Way or the adjoining sidewalk. With this information it seems unlikely that we will <br /> be able in drill and install monitoring well MW- 14 on the south side of Charter Way. However, we <br /> will have US Alert check this location again . <br /> The vertical definition of the release was defined by boring (B-2) we drilled on November 6, 2000. <br /> We followed the instructions of Carol Oz of the EHD and found the soil was not contaminated from <br /> 85 feet to 90 feet. According to Miss Oz this was enough proof that the depth of the release was <br /> found vertically. <br /> WORK PROPOSAL <br /> Lateral <br /> For the lateral definition we propose monitoring well MW- 14 along the south side of Charter Way. <br /> The boring will be drilled to a depth of 45 feet bgs. The water table is presently at 37 feet. Well <br /> samples will be taken every 5 feet to the bottom of the boring . The well screen casing will be from <br /> 25 to 45 feet and blank casing will be from 25 feet to the top of the boring . Number 3 sand will be <br /> placed in the annulus from 45 to 22 feet and a plug of bentonite will be placed from 22 to 19 feet. <br /> Cement will be placed from 19 feet to 5 inches below the top of the well casing . The well will be <br /> caped with a locking cap and a traffic box will be placed on surface to protect the well . <br /> Vertical <br /> CGG proposes to drill another boring (B-4) in the center of the old tank pit to a depth of where we <br /> are confident that the contamination has not penetrated . Soil samples will be taken every 5 feet <br /> and will be logged . Water samples will be taken every 10 feet starting at 60 feet bgs to the depth <br /> of the boring . We will use Spectrum Exploration Drilling to drill both borings. <br />