Laserfiche WebLink
CALIFORNIA GEOPHYSICAL GROUP, INC . I � l <br /> P . O . Box 578341 , Modesto, CA 95357 ° i; l: Tel : (209) 527- 1247 <br /> May 71 2004 04 MAY 17 PM 2: 09 Fax : (209) 527-4810 <br /> Revised <br /> Work Plan r ) <br /> Darpetro, Inc. (USA) <br /> 749 E. Charter Way <br /> Stockton, CA <br /> SITE No. 1060 <br /> California Geophysical Group has been contracted by Darpetro , Inc. to act as their Environmental <br /> Consultant for this site. The following work will be performed to determine the source of the <br /> hydrocarbon contamination . <br /> HISTORY <br /> On November 14, 1989 three tanks were removed at this site and three fiberglass tanks were <br /> installed . The laboratory results taken at the time of removal tested positive for gasoline <br /> hydrocarbon contamination . <br /> i <br /> j On December 19, 1989 an Electromagnetic Induction Survey was conducted on the site to aid the <br /> investigation of the aerial extent of the contaminated soil and in planning the position of the <br /> monitoring wells. <br /> In January 1990 three monitoring wells were installed . They were reported in our report dated <br /> February 9 , 1990 . <br /> In March and April 1992, three more monitoring wells were installed . They were necessary <br /> because the groundwater had fallen below the depth of the original wells. This work was reported <br /> in our report dated April 30, 1992. <br /> In July 1993 we installed two additional monitoring wells and drilled one boring . This work was <br /> reported in our report dated August 24 , 1993 . <br /> In September 1994 , we installed three additional monitoring wells. This work was reported in our <br /> report dated October 10, 1994. <br /> In April 1995 we drilled two CPT borings and this was reported in our report dated March 15 , 1995 . <br /> In February and March , 1996 five vapor extraction wells, one air sparging well and one boring <br /> were installed at this site . This work was reported in our report dated March 19 , 1996 . <br /> In April 1996 we drilled two additional CPT borings . They were reported in our report dated June <br /> 10, 1996 . <br /> In July 1999, we drilled an additional monitoring well BM- 12 to 80 feet. This was reported in our <br /> report dated August 5 , 1999 . <br /> In November 2000 two borings B-2 and B-3 were drilled and on December 7 , 2000 one monitoring <br /> (BM- 13) well was drilled . This was reported in our Drilling Activity Report dated December 14, <br /> 2000 . <br />