My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:51:19 AM
Creation date
3/5/2019 9:28:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M � ` <br /> probed meter is used by Del-Tech to insure the highest level of field monitoring of the parameters <br /> described. If requested dissolved oxygen and oxidation redox potential will be also included. At <br /> a minimum three well casing volumes will be attempted to be removed. If at this time the well <br /> stabilization has not occurred then additional well volumes will be purged until a variance of less <br /> than 10% is indicated or a N.T.U. turbidity reading of less than 15 is recorded. <br /> All purge water is discharge and contained in 60 gallon poly drums. Each of these drums are sealed <br /> and labeled at the end of the monitoring event. They are then dollied to the most logical storage <br /> location on site, as to not cause a traffic hazard. Drum counts are completed each time the site is <br /> sampled and the inventory is recorded on the fust page of the Del-Tech field monitoring log. <br /> Next, the well is re-sounded to assure that a minimum of 80% water column recharge has been <br /> achieved. <br /> Once well stabilization has occurred, the well is sampled through the dedicated discharge tubing on <br /> dedicated well heads or with a clean stainless steel or disposable PVC bailer. The bailer is lowered <br /> into the well slowly as to not disturb the water within the casing. The bailer is lowered on a stainless <br /> steel cord that is wound onto a poly reel. Then the poly reel is spooled back up and the sample is <br /> decanted slowly as to not oxygenate or volatilize any possible constituents within the sample media. <br /> Only containers with the appropriate preservatives are used to collect these samples. All sample <br /> containers are provided by a state certified laboratory pre-preserved. <br /> Immediately after sampling all of the samples collected are labeled and logged into a Chain-of- <br /> Custody. The samples are then placed into a ice chest with a mixture of blue ice and ice (frozen <br /> water.) The well head is now sealed up, decontamination of all downhole sampling equipment is <br /> completed with a field portable decontamination trailer. Each piece is thoroughly cleaned and <br /> returned to a clean container for storage. We then move on to the next sampling point or monitoring <br /> well and repeat the procedure. <br /> Example of preprinted labels used by Del-Tech on a routine basis : <br /> CLIENT : YOUR COMPANY NAME / CONTACT ( 503 ) 555 - 121io <br /> SITE : YOUR SITE NAME / ADDRESS <br /> DATE : <br /> PRESERVATIVES : HCL <br /> LOCATION : MN- 000 <br /> - <br /> COLLECTED BY : DEL-TECH 847 - 8757 <br /> Any additional site specific quality control or quality assurance measures required during the <br /> monitoring event will be adhered to as requested and required. <br /> Upon completion of the groundwater monitoring event a field summary report will be completed. <br /> The following pages are an example of the format and layout of the report. All information is in the <br /> MS Excel format and can be easily forwarded via E-mail. <br /> Del -Tech Geotechnical Support <br /> Standard Operating Procedures / Groundwater Monitoring 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.