GENERAL PROVISIONS
<br /> I.� VALIDATION/REVOCATION-This permit is not valid unless signed by the Public Works Director or his authorized representative. This permit Is non-
<br /> transferable and is void if work is not completed prior to expiration date. An extension may be granted if such is requested forty-eight(48)hou-s b,<'ire the
<br /> permit expires.
<br /> 2. ACCEPTANCE OF PROVISIONS-It is understood and agreed by the permittee that the performing of any work under the permit shall constitute an
<br /> acceptance of the provisions.
<br /> 3. KEEP PERMIT AT JOBSITE-The permit and control number shall be kept on the jobsite and shall bn shower to any repre.-,?>r.=hive of the Cit r e er"':=sting
<br /> verification of permit issuance.
<br /> 4. INSPECTION AND APPROVAL-A minimum of 24 hours notice shall be required prior to placing any backfill,connection to any existing facility,cr the
<br /> placement of any concrete or asphalt paving.Inspection shall not be deemed a waiver on the part of the City of the right to demand correction of dr`ects
<br /> discovered at a subsequent date.
<br /> 5. STANDARD PLANS AND SPECIFICATIONS-All work shall conform to the City of Stockton Standard Plans and Specifications.
<br /> 6. SURVEY MONUMENT PRESERVATION-Any monuments including,but not limited to,chisel crosses,witness corners,and iron pins that control the
<br /> location of subdivisions,tracts,boundaries,property lines,roads,streets,or provide survey controls,and that may be disturbed or destroyed during
<br /> construction,shall be referenced by a licensed land surveyor and reset in the surface of the new construction or set a permanent witness monument.
<br /> Corner records or Records of Survey shall be filed as required.(California Business and Professions Code 8771 and California Streets and Highways
<br /> Code 732.5, 1492.5, 1810.5)
<br /> 7. MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC-All work shall be plani ted and carried out so there will be the least possible
<br /> inconvenience to the traveling public. Placing of lights,barricades,warning signs and other safety devices required for puhlic safety shall be the
<br /> responsibility of the permittee. All work-zone traffic controls shall be in accordance with the nins4 current revision of Chapter 5 of the State of California,
<br /> Department of Transportation Traffic Manual.
<br /> 8. STANDARD WORKING HOURS-All work shall I.%-restricted to the hours N hveen 8:30 a.m.and 4:30 p.nn.,�-xcept on an,,riels and collectors eehe_se the
<br /> work is limited to the hours between 9,00 ami.tinct 3:00 p.m.,unlWss othr-.tAmsr n ted or.?�=is p:rarrroi.
<br /> 9. FAILURE TO COMPLY WITH GENERAL pRGVISIONS-The perrr Wvr s, es o reimF Irme the City for oerforming all work•,end I.rni-hir p�!4 rn,erials tr,
<br /> correct any failure to comply with these prcvisir.rs,as*-A'L as al!apolicahle City Ordina.r,,res and Stanoard Plans and SI'e,.f :=-tir.rm,cur.erflw
<br /> 10. NOTIFICATION OF UTILITY COMPANY-The permittee shall notify utility=M.Pawes 4F,rtuurs prior to br sic:: iFry any cor.st!uc;on,wltic;h r:ray:r:kve
<br /> underground or overhead facilities and wil;pay all expenses for any removal or relocation necessary.Valves on water mair•s av riot be tura(n f:=itnout
<br /> permission of the utility company involved.
<br /> 11. NOTIFICATION OF POLICE,FIRE AND PUBLIC WORKS DEPARTMENTS-When streets are to be blocker,the Police,Fire and Public Works
<br /> Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered.Access to firm-hwirants shall he morint�ined
<br /> at all times. Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer.
<br /> 12. CLEANUP OF JOBSITE-The permittee will remove any refuse material from the jobske within three days after completion of the work.
<br /> 13. DELINQUENT BILLS.Failure to pay any delinquent bill accrued under any previous permit issued by the Public Works Department will be cause for
<br /> rendering the applicant ineligible for any other permit from the Public Works Department until such bill is paid.
<br /> 14. MEETING EXISTING IMPROVEMENT-The permittee shall be responsible for meeting all adjacent frontage improvements such as paving and sidewalks.
<br /> 15. PARKING METER AND TRAFFIC SIGN REMOVAL-The permittee shall contact either the Traffic Maintenance Supervisor at(209)937-7408,or the
<br /> Senior Public Works Supervisor at(209)937-8534 of the Public Warks Traffic Devices Section,at least 48 hours prior to any parking meter or traffic sign
<br /> removal.
<br /> ***IMPORTANT-*
<br /> MANDATORY Encroachment Permit Procedures
<br /> To provide a more efficient and economical inspection service for Encroachment Permit construction,the following procedure shall be followed by all permittees:
<br /> 1. Notify the Permit Engineer, (209)937-8366,to obtain a control number,no less than 24 hours,but not in excess of 72 hours prior to the start of work,
<br /> and prior to any required inspections as identified below. If work does not begin within 72 hours of the issuance of.a contr,)l number,the control
<br /> number will be invalid and the permittee shall call for a new control number. (For City Capital Improvement Projects or subdivision improvements,
<br /> permittee shall contact the assigned City Project Engineer at(209)937-8411 for specific instructions prior to the beginning of any work.)
<br /> 2. Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction.
<br /> 3. Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work.
<br /> 4. Notify Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection.
<br /> 5. Notify the Permit Engineer upon completion of construction at(209)937-8381.
<br /> REQUIRED INSPECTIONS
<br /> Listed below are several types of construction and points at which inspections must be made,prior to continuing construction operation. Unauthorized
<br /> continuance of construction beyond an inspection point may result in rejection of all work.
<br /> CONCRETE: PIPE INSTALLATION:
<br /> 1. Grade and excavate before forming 1. Excavating and bedding
<br /> 2. Forming before placement of concrete 2. Pipe installation and/or utility connections
<br /> 3. Beginning and during asphalt paving 3. Backfill(compaction test may be required)
<br /> 4. Cleanup and final approval 4. Beginning and during asphalt paving
<br /> 5. Final approval