Laserfiche WebLink
Morita Brothers <br />Well Abandonment Plan <br />Project No. 912.2 <br />January 29, 2010 <br />• July, 2009 -- SJC EHD directed GTI to prepare and submit Site Closure Summary <br />Report (Appendix B), and resume modified groundwater monitoring schedule. <br />• In a correspondence letter dated November 18, 2009, the Regional Board staff <br />reviewed the October 29, 2009 Case Closure Summary and ordered a No Further <br />Action Required notice. <br />2.0 WELL ABANDONMENT <br />2.1 Purpose of Well Abandonment <br />GTI was directed by Mr. Brian Newman, the Underground Tank Program Manager for the <br />California Regional Water Quality Control Board to abandon the monitoring wells located at <br />814 E. Charter Way, Stockton, California in a letter correspondence dated November 18th, <br />2009. <br />SJCEHD directed Frank Morita, in a letter dated December 1, 2009, to abandon eighteen (18) <br />monitoring wells in total. However, ownership of two of the wells, MW -II & MW -208, will <br />be transferred to Beneto Inc. and one well (l4y�-3 was inadvertently left�f the SHCEHD <br />directive. See Appendix B for regulatory agency correspon*�enee7etters. �— <br />In summary, the following 17 wells will be abandoned: Eight (8) monitoring wells (MW -1, <br />MW -6, MW -7, MW -106, MW -107, MW -108, MW -109, and MW -209) will be drilled out, <br />removing the well contents and grouted. The remaining nine (9) monitoring wells (MW -2, <br />MW -3, MW -4, MW -5, MW -104, MW -110, MW -111 MW -202, and MW -210) will be <br />pressured grouted and the upper 5 feet bgs will be drilled out. <br />The ownership of two (2) monitoring wells, MW -11 and MW -208, have been transferred to <br />Beneto Inc. See Appendix A for copy of Agreement. <br />2.2 Abandonment Procedure <br />The well will be sounded to ensure that the casing is clear to total depth. If the well -is not <br />open to total depth (obstructed), then the well casing and surrounding construction materials <br />will be removed entirely by over drilling with hollow stem auger rig. <br />For grouted wells: <br />C ��_ .,• • A neat cement grout (containing less than 4% bentonite) will be pumped under pressure <br />through a tremie pipe to the bottom of the well. In this manner, the grout will isplace <br />the water in the well insuring that it is completely filled with grout. <br />• After the grout has displaced all water from the well and filled to the top, a pressure cap <br />will be fitted to the casing and placed under 25 lbs. pressure until stable. This will force <br />the cement into the filter pack. Additional grout will be pumped into the well casing to <br />fill up the balance. <br />Geological rechuda 14C. 3 <br />7242 Well Aband WP 1 -29 -IO <br />