My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
814
>
3500 - Local Oversight Program
>
PR0544222
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 2:07:09 PM
Creation date
3/5/2019 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544222
PE
3528
FACILITY_ID
FA0005976
FACILITY_NAME
TIRE & WHEEL MASTERS
STREET_NUMBER
814
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16718101
CURRENT_STATUS
02
SITE_LOCATION
814 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Mr. Morita -2 March 17 '2003 <br /> they were in fact necessary, the Fund will reimburse at reasonable rates (rates consistent with <br /> those pre-approved). <br /> In order for future costs for corrective action to be part of the expedited reimbursement <br /> process;they must be pre-approved in writing by Fuad staff. <br /> All costs for corrective action must meet the requirements of Article 11, Chapter 16,` <br /> Underground Storage Tank Regulations in order.to be eligible for reimbursement. <br /> • The Fund will review any tasks/costs that go beyond the pre_approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> exceed the above pre-approved amoiints,`the Fund`willrbe unable toexpedite your <br /> Reimbursement Request, <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs <br /> on the new"scope of work. ; <br /> • Although.i have referred to the GTI proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State of California-cannot compel you to sign <br /> any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. " <br /> Please remember that it;is.still necessary to subn t-the actual costs of the work as explained in <br /> the Reimbursement Request-Instructions to confirm that the costs are consistent with this pre- <br /> approval <br /> re <br /> approvalbefore-you will_-be reimbursed,,Please.insure that your consultantprepares their <br /> invoices to <br /> in <br /> the required breakdown of costs on a timeand materials basis, that <br /> invoiced tasks are consistent.with.the original proposal, and that.reasonable explanations,are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all. <br /> is , <br /> • subcontractor invoices, <br /> • technical reports, when available, and- <br /> • applicable correspondence from.the County. <br /> Ca.11farnia En viroomeatal Protection A enc <br /> g y , <br /> CO <br /> b <br /> �, RecYc%dPnper. <br />
The URL can be used to link to this page
Your browser does not support the video tag.