Laserfiche WebLink
' CJeo(ogual7ecfrnus Ync Page 4 <br /> Well Installation Report <br /> Morita 13rothers <br /> Project No 124 2 <br />' November 12, 1999 <br /> • 4.2 Recommendations <br /> Geological Technics Inc makes the following recommendations based on the conclusions <br /> outlined above <br /> I1 Groundwater monitoring should occur for three more quarters to determine the <br /> concentrations of gasoline compounds in the wells and to track groundwater flow before <br /> any decisions are made regarding further investigation <br /> I <br /> 5.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This report was prepared by <br /> ICJeofoB'zcaf 7echnws I= <br /> v <br /> • Michael J Niemi <br /> Geologist <br /> QOf1r,5Sfp '^,! <br /> ti0� cF <br /> I �� R i iCABIAriOW E! �� <br /> o <br /> I Raynold I Kablanow II, Ph D NO 5234 <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist 4442 <br /> I <br /> • <br /> 4 <br />