My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 1988 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 1:26:35 PM
Creation date
3/5/2019 1:32:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2000
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02'22%99 18:IS NO.0-7169 P <br /> Repair procedures Center the coupling around the gap in the pipe. <br /> (count.) Abrade all bonding surfaces before applying adhesive. <br /> • Coat the cut ends of-he pipe and bonding surfaces with achesive,:hen <br /> bolt:he ca:pting halves together. TO <br /> Ap*adhesive to nax �a en ate <br /> c„!srrcwvrploe � I � �- <br /> i <br /> Fig.94.Moderate darnago ran <br /> be repaired by cutting out a <br /> shon Length of plea andjouning <br /> the ands with complete <br /> coupfing or arrafl-coupling. { <br /> 12u \ -•- L—2"n <br /> SCUWO-CUt pias MIS, <br /> (rtatlspereCl <br /> '-�atf-awP�n9 <br /> (lull coup ing opEbnO <br /> Major damage(over 3 inches in length) <br /> Camage in which more than three inches of oioe must be removed is considered <br /> major.Major damage is typically caused by excavation equipment or large objects <br /> Striking the pipe.Repair major damage with a replacement nipple and one or more <br /> repair couplings. <br /> • Fordarnage less than 10 inches in length,a single full-size.14-inch long <br /> )oupiing will provice the r5quirec 2 nch pipe Insertion at each end <br /> • To make repairs greater than'0 incites in length,use two fuil-size cr haif- <br /> couclings to join the reolacemern nipple with the existing line as shown <br /> in Fig.9--- <br /> r—————————— `1 Fallow the guideines given for minor damage:abrade all bording <br /> Failure to restrict the maximum gap ,y,lrfaces,coat ail cut pipe encs wrth adhesive and observe spacing and <br /> aetween pine ends to 3 aches and ( insertion deoth requirements. <br /> to provide a minimum 2-inch <br /> inserdc n death of pipe in the repair 3•;Pecarr aree�.o ---+ <br /> couplings nuilifles the <br /> UL listing mark. Glued areas <br /> F. <br /> _9 4_Maw damage is repaired bi <br /> removing the damaged pipe_.4rlacmd / MR 'i <br /> areas under T incnes in length are X, <br /> repaired using a ruG-length cairpting ro <br /> Hord a pipe nipple. s mex <br /> 2 min �"I gap <br /> RA coupong - f <br /> Rep*area, 0 <br /> Fia_9ti_Repairs over ld inches in <br /> Glued areas <br /> ,pngrh we made try touring a ! I <br /> replacement nipple to wund pipe e <br /> wi0i wnore or half-couplings at i <br /> aach end. <br /> MAI -A <br /> 2 min <br /> Hag-cow" <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.