My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
COMPLIANCE INFO 1988 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 1:26:35 PM
Creation date
3/5/2019 1:32:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1988 - 2000
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-04-1 999 d:abPP 1 FRCt I P- <br /> II. GENERAL INFORMATION: <br /> 1. obtain an EPA Site Number from the Department of Toxic Substances Control (300) 61-TOXIC for temporary <br /> hazardous waste removal activities associated with underground storage tank(UST) removals. <br /> 2. Disposal Information: Public Healdh Services Underground Storage Tank Disposition Tracking Record (UST <br /> Tracking Record, page 10) shall accompany each tank removed from site. Tank(s) will be issued an identification <br /> number which PHS-EHD's representative will note on the UST Tracking Record. Contractor will affix same <br /> identification number onto tank end using fluorescent spray paint. Contaminated tanks and/or piping are to be <br /> transported under Hazardous Waste Manifest by a state registered hazardous waste hauler. <br /> 3. Contractor to Provide: Combustibie,'F'latnlmabie gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level of tank prior to lifting from excavation), adequate number(s) and appropriate type(s) <br /> of fire extinguisher(s), barriers to secure the area as necessary to minimize traffic and pedestrian interference, and <br /> fluorescent spray paint to affix tank identification numbers. It shall be the project manager's responsibility for <br /> compliance with all health &safety regulations and requirements, which shall be strictly adhered to at all times <br /> during the course of the closure activities. <br /> 4 The PHS-EHD permit shall be on site during tank excavation and removal. <br /> 5. Any changes in this document shall be approved by PHS-EHD prior w initiating work. <br /> 6. Closure-in-Place: If Closure-in-Place is the suggested method of abandonment, complete form <br /> EH 23 039 and submit written approval from the local Eire Department. <br /> 7. Temporary Closure: If Temporary Closure is the suggested method of abandonment, complete <br /> and submit this form and a written approval from the local Fire Department. <br /> 3_ The following documentation shall be submitted within 30 days of the tank removal date: <br /> a) Analyticai results, mailed directly from laboratory to PHS-EHD, including a chain of custody and quality <br /> assurance and quality control (QA & QC). <br /> b) UST Tracking Record Sheet(s) andler Tank Hazardous Waste Manifest(s)_ <br /> C) Tank Closure Certification Form (DTSC form 1249)- <br /> d) Hazardous Waste Manifests for piping, rinsate, residual fuel, or waste oil receipt. <br /> e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated City <br /> Building Departments. This report will be referred to the appropriate agency for their review. <br /> A site which has had UST(s) removed. shall not be considered for Etnal closure until the above items are <br /> submitted for review. <br /> III. SITE MITIGATION: <br /> 1. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is the <br /> responsibility of the owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating <br /> any assessment or remediation activities. To minimize delays, a Corrective Action Plan may be submitted <br /> concurrent with tank closure or installation pians. Address one copy of the Corrective Action Plan to the Site <br /> Mitigation Unit for review. For further assistance contact the Site Mitigation Unit at (209)463-3450, <br /> EH 23 046 (Revised l0/19/98) Page 2 <br /> :4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.