Laserfiche WebLink
2-04-1999 4:48 P1 FROP_t P. 6 <br /> 8. a,. Describe the method that will be utilized to purge andlor inert the tank(S): <br /> \ b -e W r.\ <br /> *tsi E r w c=. <br /> b. TankiPiping Hauler. <br /> Name <br /> Address Z'SS �p�.(' City - Q���.,..�,�� Zip `v4'\og <br /> Phone NO 51p <br /> Hauler Registration#(if hauled as hazardous) L 14 c- py\l <br /> C. Tank0ping Disposal Site: <br /> Name �G 'r�Uf Son � n� <br /> Address ZS City <br /> Phone No.( ;L U �)_ a 3 S j "It�' <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES, NO <br /> (j <br /> 9a. Describe,in detail,how the soil andier water sample(s)beneath the tank and piping will be obtained: <br /> 'C N t <br /> 4.V-U <br /> 10. Describe hove the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a)What material Will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Soil Hazardous Waste Hauler: <br /> Name Hauler Registration# <br /> Address City Zip <br /> Phone No.( ) <br /> EH 23 046(Revised 10119198) Page 5 <br />