Laserfiche WebLink
Feb-10-99 11 :07A Pinnacle/EMCON P_ 08 <br /> Operations Plan <br /> Map or site sketch attached as Exhibit <br /> Site control(for vehicles,workers,the public, etc.)shown on Exhibit_ <br /> Zones of contamination: U Known ❑ Projected ❑ Unknown <br /> Excavation, drilling, or sampling method: Excavation by backhoe, sampling by handauger -and <br /> ha d-o e ated percussion 2quipment. <br /> Comments: <br /> Safety Equipment and Procedures <br /> Level of protection: ❑A 17 B ❑ C l] D <br /> Additions and modifications: level D PPE required at all times while on-site. Level D PPEinclu Imes <br /> hard hat and steel toed boots. If contact with soil is anticipated use butyl rubber gloves or vinyl <br /> gloves,wear coated tyyek suits if soil and wate contact arc unavoidable <br /> Special surveillance equipment and materials: Monitor bre at ing zone with PID calibrated to 100. <br /> ppm isobutylene standard If PID readings consistently exceed 50 Vam use respirator with arl=_anic <br /> v_ar acid cartridges Cease work if PID readings consistently exceed250 tmm and relocate_to <br /> upwind location. <br /> Decontamination procedures: Decontaminates tin c ent in a conox wash a d dis os of <br /> PPE' d si nated area. <br /> CP1L:IARCO\.5"91Rl;.PQRTW469PIOL- OC-95 fsg:l 3 <br />