Laserfiche WebLink
Raychem <br /> Adrienne Klopack Raychem Corporation <br /> Regional.Sales Manager TraceTek' Products Group <br /> 300 Constitutio^ O ive <br /> Menlo Park CA 9,025-1164 <br /> 41513616209 <br /> TAX 415/361390- <br /> r `rracctekx Lvultiple-channel Alai7n System <br /> Facility a€ �(�%� Dater Qu <br /> Address <br /> ��C, ��, 5�� �.Dt.►�C A�r�.ul..u� S-F�pX Ccs.( l�.11�t►.aC,� <br /> haS Cor �c,�S w�st <br /> \� .,� t � ate �►-� R tcic C til <br /> Z verify intrinsic safety \�O�hoJ c-, <br /> XProper field wire termination ` <br /> i <br /> Proper 'power Wiring with earth ground and individual breaker <br /> XComplete isolation of I_s. field wiring from any other wiring <br /> especially in gutters <br /> Prover use of E.Y.S. fittings <br /> II. Check for proper panel installation <br /> Panel mounted in a nonhazardous location <br /> x Panel is accesible to station operators <br /> 7—All field wiring is Yabelled at terminal strip or adjacent gutter <br /> I <br /> ! All wiring to panel is broutZht through appropriate punch-outs <br /> QII Check for proper probe installation <br /> XPiping sump sensors suspended within one inch of sump bottom <br /> W-Double walled FRP tank sensors(LS-7) installed at bottom o: tank, <br /> with a pull wire circumventing the primary tank and accessible <br /> i <br /> from grade. <br /> i Annular space risers should be sealed watertight with field <br /> wiring penetrating using cable grips or other apprpriate method <br /> Probe leads terminating in a watertight .7-box <br /> ' XV Check system operation <br /> XVerify proper fuctioning of alarm horn and lights by pushing <br /> the test button / I^ <br /> I �I\Co�'i`cJ�N <br />